PREL201811781
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 1/29/2019 (10:00 - 12:00) | 1/29/2019 (AM) | 01/29/2019 |
Corrections:
Miscellaneous/Other
Comment Only
01/29/2019
Wall RI- OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/11/2019 (12:30 - 2:30) | 3/11/2019 (PM) | 03/11/2019 |
Corrections:
Miscellaneous/Other
Comment Only
03/11/2019
Service inspection. Bond at CT cabinet and email photo. Grounding is not complete.
OK to release to Xcel.
1200 AMP - 3 phase 120/208 volt commercial service.
Maintain clear and unobstructed exiting from electrical rooms.
|
||||
Electrical Rough-in Inspection | Partial Pass | 5/2/2019 (8:00 - 10:00) | 5/2/2019 (AM) | 05/02/2019 |
Corrections:
Miscellaneous/Other
Comment Only
05/02/2019
RI OK At escape room #4
|
||||
Electrical Rough-in Inspection | Partial Pass | 5/14/2019 (12:30 - 2:30) | 5/14/2019 (PM) | 05/14/2019 |
Corrections:
Miscellaneous/Other
Comment Only
05/14/2019
Above ceiling at kitchen, bathrooms, and drop ceiling areas
|
||||
Electrical Rough-in Inspection | Passed | 5/29/2019 (10:00 - 12:00) | 5/29/2019 (AM) | 05/29/2019 |
Corrections:
Miscellaneous/Other
Comment Only
05/29/2019
Above ceiling at escape room OK
|
||||
Progress Inspection | Partial Pass | 6/10/2019 (8:00 - 10:00) | 6/10/2019 (AM) | 06/10/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/10/2019
Progress inspection- elevator equipment OK.
|
||||
Miscellaneous/Other
Comment Only
06/10/2019
Progress inspection- rooftop equipment OK
|
||||
Miscellaneous/Other
Carried Forward
06/10/2019
Verify available fault current: RTU equipment has a 5 K SCCR ratings. Elevator equipment has a 10 K SCCR rating.
|
||||
Electrical Final Inspection | Partial Pass | 6/18/2019 (10:00 - 12:00) | 6/18/2019 (AM) | 06/18/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
07/17/2019
Verify available fault current: RTU equipment has a 5 K SCCR ratings. Elevator equipment has a 10 K SCCR rating.
|
||||
Miscellaneous/Other
Comment Only
06/18/2019
Progress inspection- plug checks at upper level.
|
||||
Electrical Final Inspection | Failed | 7/17/2019 (10:00 - 12:00) | 7/17/2019 (AM) | 07/17/2019 |
Corrections:
Miscellaneous/Other
Comment Only
07/17/2019
Receptacle checks at bar OK.
Life safety test for lighting OK
See list for unresolved items:
|
||||
Miscellaneous/Other
Comment Only
08/07/2019
For final inspection: see email correspondence.
1. Provide available fault current at service and documentation for any series rated panels.
2. Energy code compliance documentation.
3. Independent third party evaluations.
4. As built plans.
Laser tag area not complete, main level kitchen not complete.
|
||||
Miscellaneous/Other
Comment Only
08/07/2019
OK to occupy and use space- partial pass for final inspection.
|
||||
Electrical Final Inspection | Partial Pass | 8/7/2019 (10:00 - 12:00) | 8/7/2019 (AM) | 08/07/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
08/07/2019
Verify available fault current: RTU equipment has a 5 K SCCR ratings. Elevator equipment has a 10 K SCCR rating.
|
||||
Miscellaneous/Other
Comment Only
08/07/2019
OK to occupy and use space. Partial pass of electrical final inspection.
|
||||
Miscellaneous/Other
Carried Forward
08/07/2019
Verify listing of black light luminaries and power supplies at vest charging stations at laser tag area.
|
||||
Miscellaneous/Other
Carried Forward
08/07/2019
Review of submittals by AHJ.
Clarification needed at available fault current.
|
||||
Miscellaneous/Other
Carried Forward
08/07/2019
Signs are not complete.
|
||||
Electrical Final Inspection | VOID | 09/27/2019 | ||
Corrections:
Miscellaneous/Other
Resolved
09/27/2019
Verify available fault current: RTU equipment has a 5 K SCCR ratings. Elevator equipment has a 10 K SCCR rating.
|
||||
Miscellaneous/Other
Resolved
09/27/2019
Verify listing of black light luminaries and power supplies at vest charging stations at laser tag area.
|
||||
Miscellaneous/Other
Resolved
09/27/2019
Review of submittals by AHJ.
Clarification needed at available fault current.
|
||||
Miscellaneous/Other
Resolved
09/27/2019
Signs are not complete.
|
||||
Electrical Final Inspection | Passed | 09/27/2019 | ||
12/23/2019: Finaled the information - was stuck in issued. Vandewege Meredith 12/23/2019 3:02 PM |