Summary

PREL201811950
Electrical
Finaled
BLN OFFICE PARK ASSOC
Repair/Replace
Replace existing light fixtures with new LED light fixtures in 3rd Floor Commons/Corridors areas - BLN Office Park.
10/04/2018
10/05/2018
07/29/2019
01/30/2019

Locations

Permits

Permit Number: PREL201811950

Electrical
Finaled
10/05/2018
07/29/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Partial Pass 11/19/2018 (8:00 - 10:00) 11/19/2018 (AM) 11/19/2018
Corrections:


Miscellaneous/Other
Carried Forward
11/19/2018
3rd floor elevator lobby and 1/2 of 3rd floor corridor. Partial pass- verbal to GC for removing or supporting limited energy cables and verify scope of any fire alarm cable work.

Electrical Final Inspection Passed 01/30/2019
Corrections:


Miscellaneous/Other
Resolved
01/30/2019
3rd floor elevator lobby and 1/2 of 3rd floor corridor. Partial pass- verbal to GC for removing or supporting limited energy cables and verify scope of any fire alarm cable work.