Permit Application Status

PREL201814252


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201814252
Electrical
Finaled
AL JAZARI INSTITUTE PROPERTY LLC
Repair/Replace
work with Brothers fire and security, FA system upgrade. reconnect 3 existing exhaust fans into new FA box, contact Ahmed bldg sup @ 612-720-6920 for locations
11/15/2018
11/15/2018
05/28/2019
11/29/2018

Locations

Permits

Permit Number: PREL201814252

Electrical
Finaled
11/15/2018
05/28/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Failed 11/19/2018 (12:30 - 2:30) 11/19/2018 (PM) 11/19/2018
Corrections:


Miscellaneous/Other
Carried Forward
11/19/2018
Install equipment grounding conductor in flexible metal conduit. Verify potential splice of flex at taped up joint. Call for reinspection.

Electrical Final Inspection Passed 11/29/2018 (8:00 - 10:00) 11/29/2018 (AM) 11/29/2018
Corrections:


Miscellaneous/Other
Resolved
11/29/2018
Install equipment grounding conductor in flexible metal conduit. Verify potential splice of flex at taped up joint. Call for reinspection.