PREL201814301
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
12/21/2018
Need fault current calculations service and DP. If series rating used, panels will need to be as such.
|
||||
Miscellaneous/Other
Outstanding
12/21/2018
Physical damage Protection needs to be provided for service on exterior of building.
|
||||
Electrical Rough-in Inspection | Failed | 11/21/2018 (12:30 - 2:30) | 11/21/2018 (PM) | 11/21/2018 |
Corrections:
Miscellaneous/Other
Carried Forward
11/21/2018
Grounded conductors need to be connected and bonded in service disconnect. CT can is not service point. NEC 250.24
|
||||
Miscellaneous/Other
Carried Forward
11/21/2018
GEC to building steel can not verify where point of termination is in service.
|
||||
Electrical Rough-in Inspection | Passed | 12/21/2018 (12:30 - 2:30) | 12/21/2018 (PM) | 12/21/2018 |
Corrections:
Miscellaneous/Other
Resolved
12/21/2018
Grounded conductors need to be connected and bonded in service disconnect. CT can is not service point. NEC 250.24
|
||||
Miscellaneous/Other
Resolved
12/21/2018
GEC to building steel can not verify where point of termination is in service.
|
||||
Electrical Final Inspection | Partial Pass | 12/21/2018 (12:30 - 2:30) | 12/21/2018 (PM) | 12/21/2018 |
Corrections:
Miscellaneous/Other
Carried Forward
12/21/2018
Need fault current calculations service and DP. If series rating used, panels will need to be as such.
|
||||
Miscellaneous/Other
Carried Forward
12/21/2018
Physical damage Protection needs to be provided for service on exterior of building.
|