PREL201815241
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 1/16/2019 (8:00 - 10:00) | 1/16/2019 (AM) | 01/16/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/16/2019
RI OK at 2nd floor prep kitchen.
Note there are two separate spaces associated with this permit. The larger space on 3rd floor and a smaller prep space on 2nd floor.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 1/25/2019 (8:00 - 10:00) | 1/25/2019 (AM) | 01/25/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/25/2019
Wall RI OK at 3rd floor
|
||||
| Electrical Rough-in Inspection | Partial Pass | 1/29/2019 (8:00 - 10:00) | 1/29/2019 (AM) | 01/29/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/29/2019
Half height prep wall RI -OK
|
||||
| Electrical Rough-in Inspection | Partial Pass | 8/26/2019 (12:30 - 2:30) | 8/26/2019 (PM) | 08/26/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/26/2019
Wall RI OK at bar walls
|
||||
| Electrical Rough-in Inspection | Partial Pass | 9/6/2019 (8:00 - 10:00) | 9/6/2019 (AM) | 09/06/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/06/2019
Front of house ceiling RI- OK
Wall RI OK complete
|
||||
| Electrical Rough-in Inspection | Partial Pass | 11/4/2019 (8:00 - 10:00) | 11/4/2019 (AM) | 11/04/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/04/2019
There are two separate spaces under this permit. Space 255 remote kitchen area final OK except GFCI required for 3 phase receptacle
|
||||
| Electrical Final Inspection | Partial Pass | 11/6/2019 (10:00 - 12:00) | 11/6/2019 (AM) | 11/06/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/06/2019
Egress lighting OK
|
||||
|
Miscellaneous/Other
Resolved
11/07/2019
Provide disconnect means lockable in the off position for all kitchen equipment not cord and plug connected
|
||||
|
Miscellaneous/Other
Comment Only
11/06/2019
Listing of sign at storefront OK
|
||||
|
Miscellaneous/Other
Resolved
11/07/2019
Install protection of transformer secondary conductors to code.
|
||||
| Electrical Final Inspection | Partial Pass | 11/7/2019 (10:00 - 12:00) | 11/7/2019 (AM) | 11/07/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/07/2019
Partial pass. Corrections made.
Complete all installations and call for final
|
||||
|
Miscellaneous/Other
Comment Only
11/07/2019
Inspection note- unable to obtain roof access.
|
||||
|
Miscellaneous/Other
Outstanding
11/13/2019
Inspection note- secondary connections for neon signs is electrical work and must be performed by a MN State licensed contractor
|
||||
| Electrical Rough-in Inspection | Partial Pass | 11/13/2019 (10:00 - 12:00) | 11/13/2019 (AM) | 11/13/2019 |
|
Corrections:
Miscellaneous/Other
Carried Forward
11/13/2019
Neon work not complete. All other electrical inspection items OK- partial final except as noted.
Contractor performing neon required permit and inspection
|
||||
| Electrical Final Inspection | Passed | 05/18/2020 | ||
|
Corrections:
Miscellaneous/Other
Resolved
05/18/2020
Inspection note- secondary connections for neon signs is electrical work and must be performed by a MN State licensed contractor
|
||||