Permit Application Status

PREL201815554


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201815554
Electrical
Finaled
MINNEAPOLIS ES HOTEL LLC
Alteration/Repair/Replace
Remodeling of existing hotel rooms. 10th floor
12/27/2018
01/04/2019
02/19/2020

Locations

Permits

Permit Number: PREL201815554

Electrical
Finaled
01/04/2019
02/19/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 01/17/2019
Corrections:


Miscellaneous/Other
Comment Only
01/17/2019
10th floor closet walls and switch locations at entryway OK. Limited view and access at entry- spot check at next inspection.

Electrical Rough-in Inspection Passed 1/28/2019 (2:30 - 3:30) 1/28/2019 (PM) 01/28/2019
Electrical Final Inspection Partial Pass 1/28/2019 (2:30 - 3:30) 1/28/2019 (PM) 01/28/2019
Corrections:


Miscellaneous/Other
Carried Forward
01/28/2019
Not ready- part pass. Pre final walk through units.

Electrical Final Inspection Partial Pass 1/30/2019 (10:00 - 12:00) 1/30/2019 (AM) 01/31/2019
Corrections:


Miscellaneous/Other
Carried Forward
01/31/2019
Not ready- part pass. Pre final walk through units.

Electrical Final Inspection Partial Pass 01/31/2019
Corrections:


Miscellaneous/Other
Resolved
01/31/2019
Not ready- part pass. Pre final walk through units.

Miscellaneous/Other
Comment Only
01/31/2019
10th floor - partial final of units. Corner units and ADA - not ready. Many units have wall sconces that are currently blanked off. Installation of luminaries must be performed by licensed electrical contractor.

Electrical Final Inspection Partial Pass 2/5/2019 (12:30 - 2:30) 2/5/2019 (PM) 02/05/2019
Corrections:


Miscellaneous/Other
Comment Only
02/05/2019
RI at two units- OK at 1015 -1016

Electrical Rough-in Inspection Partial Pass 3/5/2019 (2:30 - 3:30) 3/5/2019 (PM) 03/05/2019
Corrections:


Miscellaneous/Other
Comment Only
03/05/2019
Final OK at units 1004 and 1031

Electrical Final Inspection Passed w/ Conditions 3/11/2019 (8:00 - 10:00) 3/11/2019 (AM) 03/11/2019
Corrections:


Miscellaneous/Other
Comment Only
03/11/2019
Work performed previously by others. Contractor went through unit. Visual OK Units 1021 &1022.

Electrical Final Inspection Passed 8/23/2019 (12:30 - 2:30) 8/23/2019 (PM) 08/23/2019