PREL201900917
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 2/22/2019 (10:00 - 12:00) | 2/22/2019 (AM) | 02/22/2019 |
Corrections:
Miscellaneous/Other
Comment Only
02/22/2019
Wall RI OK
|
||||
Electrical Rough-in Inspection | Passed | 3/5/2019 (10:00 - 12:00) | 3/5/2019 (AM) | 03/05/2019 |
Corrections:
Miscellaneous/Other
Comment Only
03/05/2019
RI OK above hard lid ceilings.
|
||||
Electrical Final Inspection | Passed | 4/3/2019 (12:30 - 2:30) | 4/3/2019 (PM) | 04/03/2019 |
Corrections:
Miscellaneous/Other
Comment Only
04/03/2019
Verbal- verify available fault current at lighting control panel - - 5K rated.
|