Permit Application Status

PREL201901660


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201901660
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Finish line is changing to JD sports , new cash wrap, relocate light fixtures
02/26/2019
03/01/2019
10/16/2019
04/19/2019

Locations

Permits

Permit Number: PREL201901660

Electrical
Finaled
03/01/2019
10/16/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 3/4/2019 (8:00 - 10:00) 3/4/2019 (AM) 03/04/2019
Corrections:


Miscellaneous/Other
Comment Only
03/04/2019
Wall RI OK except at display wall.

Electrical Rough-in Inspection Passed 3/6/2019 (8:00 - 10:00) 3/6/2019 (AM) 03/06/2019
Corrections:


Miscellaneous/Other
Comment Only
03/06/2019
Hard lid OK at dressing rooms and wall and lid at break room OK

Electrical Rough-in Inspection Partial Pass 3/8/2019 (8:00 - 10:00) 3/8/2019 (AM) 03/08/2019
Corrections:


Miscellaneous/Other
Comment Only
03/08/2019
Wall RI OK at display walls

Electrical Rough-in Inspection Passed 3/12/2019 (10:00 - 12:00) 3/12/2019 (AM) 03/12/2019
Corrections:


Miscellaneous/Other
Comment Only
03/12/2019
Ceiling RI hard lid area store entrance

Electrical Rough-in Inspection Not Ready 4/1/2019 (10:00 - 12:00) 4/1/2019 (AM) 04/01/2019
Corrections:


Miscellaneous/Other
Carried Forward
04/01/2019
Site visit- unlisted signs require field evaluation or equivalent.

Electrical Rough-in Inspection Partial Pass 04/04/2019
Corrections:


Miscellaneous/Other
Carried Forward
04/04/2019
Site visit- unlisted signs require field evaluation or equivalent.

Miscellaneous/Other
Comment Only
04/04/2019
Questions at site

Electrical Final Inspection Failed 4/8/2019 (10:00 - 12:00) 4/8/2019 (AM) 04/08/2019
Corrections:


Miscellaneous/Other
Carried Forward
04/08/2019
Not ready. Unlisted equipment requires evaluation.

Electrical Final Inspection Failed 4/11/2019 (10:00 - 12:00) 4/11/2019 (AM) 04/11/2019
Corrections:


Miscellaneous/Other
Carried Forward
04/11/2019
Not ready. Unlisted equipment requires evaluation.

Miscellaneous/Other
Carried Forward
04/11/2019
Not ready for final. Verify egress lighting is per NEC 700.12 Complete all installations. Complete accurate panel directory and install all required labels and warning labels. Independent third party evaluation required for all unlisted equipment.

Electrical Final Inspection Failed 04/16/2019
Corrections:


Miscellaneous/Other
Carried Forward
04/16/2019
Not ready. Unlisted equipment requires evaluation.

Miscellaneous/Other
Carried Forward
04/16/2019
Not ready for final. Verify egress lighting is per NEC 700.12 Complete all installations. Complete accurate panel directory and install all required labels and warning labels. Independent third party evaluation required for all unlisted equipment.

Miscellaneous/Other
Carried Forward
04/16/2019
Met general contractor on site. All unlisted equipment, signs, displays and luminaries requires independent third party evaluation.

Electrical Final Inspection Passed w/ Conditions 4/18/2019 (12:30 - 2:30) 4/18/2019 (PM) 04/19/2019
Corrections:


Miscellaneous/Other
Resolved
04/19/2019
Not ready. Unlisted equipment requires evaluation.

Miscellaneous/Other
Resolved
04/19/2019
Not ready for final. Verify egress lighting is per NEC 700.12 Complete all installations. Complete accurate panel directory and install all required labels and warning labels. Independent third party evaluation required for all unlisted equipment.

Miscellaneous/Other
Resolved
04/19/2019
Met general contractor on site. All unlisted equipment, signs, displays and luminaries requires independent third party evaluation.

Miscellaneous/Other
Comment Only
04/19/2019
Verbal to contractor- in corridor recircuit egress light on to local lighting circuit. Verbal to GC - install all display "skins" and sign face.

Miscellaneous/Other
Comment Only
04/19/2019
Inspector note- project had numerous unlisted, displays, signs, luminaries and the like- per GC and independent third party engineer all unlisted electrical equipment has been independent third party evaluation evaluated and was approved by the PE