PREL201901660
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 3/4/2019 (8:00 - 10:00) | 3/4/2019 (AM) | 03/04/2019 |
Corrections:
Miscellaneous/Other
Comment Only
03/04/2019
Wall RI OK except at display wall.
|
||||
Electrical Rough-in Inspection | Passed | 3/6/2019 (8:00 - 10:00) | 3/6/2019 (AM) | 03/06/2019 |
Corrections:
Miscellaneous/Other
Comment Only
03/06/2019
Hard lid OK at dressing rooms and wall and lid at break room OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/8/2019 (8:00 - 10:00) | 3/8/2019 (AM) | 03/08/2019 |
Corrections:
Miscellaneous/Other
Comment Only
03/08/2019
Wall RI OK at display walls
|
||||
Electrical Rough-in Inspection | Passed | 3/12/2019 (10:00 - 12:00) | 3/12/2019 (AM) | 03/12/2019 |
Corrections:
Miscellaneous/Other
Comment Only
03/12/2019
Ceiling RI hard lid area store entrance
|
||||
Electrical Rough-in Inspection | Not Ready | 4/1/2019 (10:00 - 12:00) | 4/1/2019 (AM) | 04/01/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
04/01/2019
Site visit- unlisted signs require field evaluation or equivalent.
|
||||
Electrical Rough-in Inspection | Partial Pass | 04/04/2019 | ||
Corrections:
Miscellaneous/Other
Carried Forward
04/04/2019
Site visit- unlisted signs require field evaluation or equivalent.
|
||||
Miscellaneous/Other
Comment Only
04/04/2019
Questions at site
|
||||
Electrical Final Inspection | Failed | 4/8/2019 (10:00 - 12:00) | 4/8/2019 (AM) | 04/08/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
04/08/2019
Not ready.
Unlisted equipment requires evaluation.
|
||||
Electrical Final Inspection | Failed | 4/11/2019 (10:00 - 12:00) | 4/11/2019 (AM) | 04/11/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
04/11/2019
Not ready.
Unlisted equipment requires evaluation.
|
||||
Miscellaneous/Other
Carried Forward
04/11/2019
Not ready for final. Verify egress lighting is per NEC 700.12
Complete all installations.
Complete accurate panel directory and install all required labels and warning labels.
Independent third party evaluation required for all unlisted equipment.
|
||||
Electrical Final Inspection | Failed | 04/16/2019 | ||
Corrections:
Miscellaneous/Other
Carried Forward
04/16/2019
Not ready.
Unlisted equipment requires evaluation.
|
||||
Miscellaneous/Other
Carried Forward
04/16/2019
Not ready for final. Verify egress lighting is per NEC 700.12
Complete all installations.
Complete accurate panel directory and install all required labels and warning labels.
Independent third party evaluation required for all unlisted equipment.
|
||||
Miscellaneous/Other
Carried Forward
04/16/2019
Met general contractor on site.
All unlisted equipment, signs, displays and luminaries requires independent third party evaluation.
|
||||
Electrical Final Inspection | Passed w/ Conditions | 4/18/2019 (12:30 - 2:30) | 4/18/2019 (PM) | 04/19/2019 |
Corrections:
Miscellaneous/Other
Resolved
04/19/2019
Not ready.
Unlisted equipment requires evaluation.
|
||||
Miscellaneous/Other
Resolved
04/19/2019
Not ready for final. Verify egress lighting is per NEC 700.12
Complete all installations.
Complete accurate panel directory and install all required labels and warning labels.
Independent third party evaluation required for all unlisted equipment.
|
||||
Miscellaneous/Other
Resolved
04/19/2019
Met general contractor on site.
All unlisted equipment, signs, displays and luminaries requires independent third party evaluation.
|
||||
Miscellaneous/Other
Comment Only
04/19/2019
Verbal to contractor- in corridor recircuit egress light on to local lighting circuit.
Verbal to GC - install all display "skins" and sign face.
|
||||
Miscellaneous/Other
Comment Only
04/19/2019
Inspector note- project had numerous unlisted, displays, signs, luminaries and the like- per GC and independent third party engineer all unlisted electrical equipment has been independent third party evaluation evaluated and was approved by the PE
|