PREL201901993
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 3/14/2019 (8:00 - 10:00) | 3/14/2019 (AM) | 03/14/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
03/14/2019
Wall RI only - ok
FA and temp control permits required.
|
||||
|
Miscellaneous/Other
Carried Forward
03/14/2019
New heat pump above ceiling with condensate pump. Check at above ceiling RI.
|
||||
| Electrical Rough-in Inspection | Passed | 4/8/2019 (2:30 - 3:30) | 4/8/2019 (PM) | 04/08/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
04/08/2019
New heat pump above ceiling with condensate pump. Check at above ceiling RI.
Heat pump connected under permit, condensate pump removed .
|
||||
|
Miscellaneous/Other
Comment Only
04/08/2019
Above ceiling - ok
Need better marking of ceiling support wires.
|
||||
| Electrical Final Inspection | Passed | 5/2/2019 (8:00 - 3:30) | 5/2/2019 (AM) | 05/02/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/02/2019
Final- ok
Verify plenum condensate pump when installed.
|
||||