Permit Application Status

PREL201903213


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201903213
Electrical
Finaled
;
ATLAS 1 LLC
Alteration/Repair/Replace
Radon: 5HP South Motor: Install 10-3 mc AP (200ft) between main panel and j box ( underneath unit at penetration), install 3-20amp fuses in main panel (FRN time delay cartridge fuses), transition to 3/4" metallic liquidtite (between j box and non fused disconnect), set 30amp 300v rated non fused disconnect (on equipment), wire motor, and set 120v near disconnect. Radon: 3HP North Motor: Install 12-3 mc AP (60ft) between main panel and j box ( underneath unit at penetration), install 3-15amp fuses in main panel (FRN time delay cartridge fuses), transition to 3/4" metallic liquidtite (between j box and non fused disconnect), set 30amp 300v rated non fused disconnect (on equipment), wire motor, and set 120v near disconnect.
04/10/2019
04/11/2019
11/05/2019
05/10/2019

Locations

Permits

Permit Number: PREL201903213

Electrical
Finaled
04/11/2019
11/05/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Failed 4/30/2019 (10:00 - 12:00) 4/30/2019 (AM) 04/30/2019
Corrections:


Miscellaneous/Other
Carried Forward
04/30/2019
All conductors must be properly marked , orange high leg, if white is used as ungrounded must be marked appropriately.

Miscellaneous/Other
Carried Forward
04/30/2019
EGC needed for sealtight if not under 6’ or used for vibration purposes.

Miscellaneous/Other
Carried Forward
04/30/2019
Motor overload protection needed per 430.32 for motors over 1hp.

Miscellaneous/Other
Comment Only
04/30/2019
Will need meet onsite for next inspection.

Electrical Final Inspection Passed 5/9/2019 (12:30 - 2:30) 5/9/2019 (PM) 05/09/2019
Corrections:


Miscellaneous/Other
Resolved
05/09/2019
All conductors must be properly marked , orange high leg, if white is used as ungrounded must be marked appropriately.

Miscellaneous/Other
Resolved
05/09/2019
EGC needed for sealtight if not under 6’ or used for vibration purposes.

Miscellaneous/Other
Resolved
05/09/2019
Motor overload protection needed per 430.32 for motors over 1hp.

Miscellaneous/Other
Comment Only
05/10/2019
Contractor verified Overloads open all ungrounded conductors.