Summary

PREL201904088
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
New tenant buildout in Mall of America including lighting and power
04/30/2019
05/17/2019
03/17/2020
09/19/2019

Locations

Permits

Permit Number: PREL201904088

Electrical
Finaled
05/17/2019
03/17/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 6/24/2019 (8:00 - 10:00) 6/24/2019 (AM) 06/24/2019
Corrections:


Miscellaneous/Other
Comment Only
06/24/2019
Back of house Wall RI OK Install ground tails and splice at all locations- verbal

Electrical Rough-in Inspection Partial Pass 8/1/2019 (10:00 - 12:00) 8/1/2019 (AM) 08/01/2019
Corrections:


Miscellaneous/Other
Carried Forward
08/01/2019
Sales floor ceiling RI

Electrical Rough-in Inspection Failed 08/19/2019
Corrections:


Miscellaneous/Other
Comment Only
08/19/2019
Sales floor ceiling RI

Miscellaneous/Other
Resolved
09/19/2019
progress and site inspections- not approved inspector has provided information to contractor and general contractor in regards to unlisted/unlabeled electrical equipment. Remove/replace non plenum cables in plenum ceilings. All electrical equipment requires NRTL listing/labeling- or provide independent 3rd party evaluation's.

Electrical Rough-in Inspection Passed w/ Conditions 8/30/2019 (10:00 - 12:00) 8/30/2019 (AM) 08/30/2019
Corrections:


Miscellaneous/Other
Comment Only
08/30/2019
progress and site inspections- not approved inspector has provided information to contractor and general contractor in regards to unlisted/unlabeled electrical equipment. Remove/replace non plenum cables in plenum ceilings. All electrical equipment requires NRTL listing/labeling- or provide independent 3rd party evaluation's.

Miscellaneous/Other
Resolved
08/30/2019
Logo sign installation OK- NRTL listed and labeled. Non plenum cable for door opener OK- installed in raceway.

Miscellaneous/Other
Resolved
08/30/2019
LED luminaires- have been field Inspected and labeled by UL. verbal confirmation from UL inspector- 230 LED luminaires have been field labeled. Preliminary report received from UL.

Miscellaneous/Other
Comment Only
08/30/2019
Remaining above ceiling areas - RI OK.

Miscellaneous/Other
Resolved
09/19/2019
Provide Independent 3rd party evaluation of improper labeled display equipment. provide documentation of Class 2 supply feeding LED luminaire panels at front of house.

Electrical Final Inspection Partial Pass 9/12/2019 (8:00 - 10:00) 9/12/2019 (AM) 09/12/2019
Corrections:


Miscellaneous/Other
Comment Only
09/12/2019
Egress lighting test OK. See reports and email for reconciliation of unlisted equipment. Commercial display equipment requires independent 3rd party evaluation.

Electrical Final Inspection Passed 9/19/2019 (10:00 - 12:00) 9/19/2019 (AM) 09/19/2019