Permit Application Status

PREL201904459


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201904459
Electrical
Finaled
CITY OF BLOOMINGTON
Alteration/Repair/Replace
New Fire Station: 1200 amp 120/208v 3 phase service Generator: 500kw 120/208 3phase
05/08/2019
06/27/2019
02/02/2021
08/06/2020

Locations

Permits

Permit Number: PREL201904459

Electrical
Finaled
06/27/2019
02/02/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 9/27/2019 (10:00 - 12:00) 9/27/2019 (AM) 09/27/2019
Corrections:


Miscellaneous/Other
Comment Only
09/27/2019
Trench Inspection- partial OK at conduits leading to switchgear. Also PVC runs to floor boxes.

Electrical Rough-in Inspection Partial Pass 10/10/2019 (12:30 - 2:30) 10/10/2019 (PM) 10/10/2019
Corrections:


Miscellaneous/Other
Comment Only
10/10/2019
UG at south side of the building OK

Electrical Rough-in Inspection Partial Pass 11/1/2019 (10:00 - 12:00) 10/31/2019
Corrections:


Miscellaneous/Other
Comment Only
10/31/2019
Visual Ok at exterior parking lot light bases

Electrical Rough-in Inspection Partial Pass 11/27/2019 (8:00 - 10:00) 11/27/2019 (AM) 11/27/2019
Corrections:


Miscellaneous/Other
Comment Only
11/27/2019
Wall RI- at all drywall walls OK

Electrical Rough-in Inspection Partial Pass 1/13/2020 (10:00 - 12:00) 1/13/2020 (AM) 01/13/2020
Corrections:


Miscellaneous/Other
Carried Forward
01/13/2020
Met onsite to discuss EM feeder, needs separation in jbox location.

Lighting Inspection Passed 01/27/2020
Electrical Rough-in Inspection Partial Pass 2/19/2020 (12:30 - 2:30) 2/19/2020 (PM) 02/19/2020
Corrections:


Miscellaneous/Other
Carried Forward
02/19/2020
Met onsite to discuss EM feeder, needs separation in jbox location.

Miscellaneous/Other
Comment Only
02/19/2020
RI OK- for above hard lid ceiling at dayroom area.

Electrical Rough-in Inspection Partial Pass 3/17/2020 (10:00 - 12:00) 3/17/2020 (AM) 03/17/2020
Corrections:


Miscellaneous/Other
Comment Only
03/17/2020
Met onsite to discuss EM feeder, needs separation in jbox location.

Miscellaneous/Other
Comment Only
03/17/2020
Above ceiling RI OK at first floor

Electrical Rough-in Inspection Partial Pass 4/16/2020 (12:30 - 2:30) 4/16/2020 (PM) 04/17/2020
Corrections:


Miscellaneous/Other
Comment Only
04/17/2020
Met contractor on site- 1. 1200 AMP 3 phase- 120/208 volt service- OK 2. Generator- set listing OK. Verbal: complete bond at CT cabinet. Verbal: remove neutral bond at feeder distribution switchboard Verbal: revise equipment grounding connection to metal enclosure- tap-con connection requires modification. Verbal: maintain physical separation between normal and EM power wiring at gutter.

Electrical Final Inspection Partial Pass 5/13/2020 (10:00 - 12:00) 5/13/2020 (AM) 05/15/2020
Corrections:


Miscellaneous/Other
Comment Only
05/15/2020
Part pass- see email dated 05/15/2020

Electrical Rough-in Inspection Partial Pass 5/19/2020 (12:30 - 2:30) 5/19/2020 (PM) 05/20/2020
Corrections:


Miscellaneous/Other
Comment Only
05/20/2020
Partial Final OK. See list for remaining items.

Miscellaneous/Other
Carried Forward
05/20/2020
1. Unlisted equipment for the chain hoist at the top of the training/hose tower. My understanding is the equipment has been electrically disconnected. 2. The available fault current at the elevator control equipment exceeds the SCCR rating. 3. The code required manual transfer switch – lacks annunciation when transferred out the “normal” position, lacks phase rotation documentation and arc flash warning labels. See NEC requirements. 4. Verification of the SCCR rating of the life-safety transfer switch. Each transfer switch has a factory SCCR rating that changes based on the OCP device protecting the feeder. There is information regarding the clearing time and SCCR rating on the transfer equipment. 5. The installation of exhaust hood for the commercial range is not yet installed.

Electrical Rough-in Inspection Passed 06/17/2020
Corrections:


Miscellaneous/Other
Comment Only
06/17/2020
1. Unlisted equipment for the chain hoist at the top of the training/hose tower. My understanding is the equipment has been electrically disconnected. 2. The available fault current at the elevator control equipment exceeds the SCCR rating. 3. The code required manual transfer switch – lacks annunciation when transferred out the “normal” position, lacks phase rotation documentation and arc flash warning labels. See NEC requirements. 4. Verification of the SCCR rating of the life-safety transfer switch. Each transfer switch has a factory SCCR rating that changes based on the OCP device protecting the feeder. There is information regarding the clearing time and SCCR rating on the transfer equipment. 5. The installation of exhaust hood for the commercial range is not yet installed.

Miscellaneous/Other
Comment Only
06/17/2020
All RI inspections approved

Electrical Final Inspection Passed 8/6/2020 (12:30 - 2:30) 8/6/2020 (PM) 08/06/2020
Corrections:


Miscellaneous/Other
Comment Only
08/06/2020
All corrections have been made. Final inspection approved.