Permit Application Status

PREL201904612


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201904612
Electrical
Finaled
ALIDADE CEDAR I LLC
Alteration/Repair/Replace
PO 36095 Relocate 2 single pole switches, re-circuit lights as required, relamp/repair existing fluorescent fixtures as required for uniform color, furnish & install 2 general duty receptacles. Disconnect wiring for construction.
05/10/2019
05/14/2019
12/14/2019
06/17/2019

Locations

Permits

Permit Number: PREL201904612

Electrical
Finaled
05/14/2019
12/14/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Passed 5/31/2019 (12:30 - 2:30) 5/31/2019 (PM) 05/31/2019
Corrections:


Miscellaneous/Other
Comment Only
05/31/2019
RI OK

Electrical Final Inspection Passed 6/17/2019 (12:30 - 2:30) 6/17/2019 (PM) 06/17/2019
Corrections:


Miscellaneous/Other
Comment Only
06/17/2019
Receptacles- ok All lighting- ok