Summary

PREL201905084
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Other
ELECTRICAL BUILD OUT OF BONCHON S372 - MOA 372 SOUTH AVE BLOOMINGTON
05/21/2019
05/22/2019
01/27/2020
07/31/2019

Locations

Permits

Permit Number: PREL201905084

Electrical
Finaled
05/22/2019
01/27/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 6/19/2019 (12:30 - 2:30) 6/19/2019 (PM) 06/19/2019
Corrections:


Miscellaneous/Other
Comment Only
06/19/2019
Wall RI and hard lid OK

Electrical Rough-in Inspection Passed 7/19/2019 (10:00 - 12:00) 7/19/2019 (AM) 07/19/2019
Electrical Final Inspection Partial Pass 7/19/2019 (10:00 - 12:00) 7/19/2019 (AM) 07/19/2019
Corrections:


Miscellaneous/Other
Comment Only
07/19/2019
Partial pass- ok to stock and for training.

Miscellaneous/Other
Carried Forward
07/19/2019
Signs not installed yet. Check GFCI circuit breaker function at panel

Electrical Final Inspection Passed 7/31/2019 (10:00 - 12:00) 7/31/2019 (AM) 07/31/2019
Corrections:


Miscellaneous/Other
Outstanding
07/19/2019
Signs not installed yet. Check GFCI circuit breaker function at panel