PREL201906807
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 9/17/2019 (8:00 - 10:00) | 9/17/2019 (AM) | 09/17/2019 |
Corrections:
Miscellaneous/Other
Comment Only
09/17/2019
Wall RI 2nd level partial east half- ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/24/2019 (8:00 - 10:00) | 9/24/2019 (AM) | 09/24/2019 |
Corrections:
Miscellaneous/Other
Comment Only
09/24/2019
Second level walls- ok
Roof top RI- ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/2/2019 (10:00 - 12:00) | 10/2/2019 (AM) | 10/02/2019 |
Corrections:
Miscellaneous/Other
Comment Only
10/02/2019
Partial 1st floor wall RI- ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/9/2019 (8:00 - 10:00) | 10/9/2019 (AM) | 10/09/2019 |
Corrections:
Miscellaneous/Other
Comment Only
10/09/2019
1st floor wall RI- ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/10/2019 (8:00 - 10:00) | 12/10/2019 (AM) | 12/10/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
12/10/2019
Attach fixtures to grid
|
||||
Miscellaneous/Other
Carried Forward
12/10/2019
Remove temp wiring in ceiling.
|
||||
Miscellaneous/Other
Comment Only
12/10/2019
Ok to cover will verify during finals.
Need minimum 1 hour for finals
|
||||
Electrical Final Inspection | Partial Pass | 12/19/2019 (8:00 - 10:00) | 12/19/2019 (AM) | 12/19/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
12/19/2019
Available fault currents marked on equipment far exceed ratings of the equipment.
|
||||
Miscellaneous/Other
Carried Forward
12/19/2019
Secondary side of transformer has no OCP for panel board. per NEC 408.36B
|
||||
Miscellaneous/Other
Carried Forward
12/19/2019
Verify generator feeder sizing and grounding / bonding. Transfer switches are 4 pole and would require generator to have GEC installed.
|
||||
Miscellaneous/Other
Carried Forward
12/19/2019
GEC for transformer installed in EMT needs to be bonded at each end or be installed in non-ferrous metallic raceway.
|
||||
Miscellaneous/Other
Comment Only
12/19/2019
RTU on rooftop rated at 35ka SCCR. - ok
|
||||
Miscellaneous/Other
Comment Only
12/19/2019
Walk through in addition area only for outlets and lighting - ok
Generator test for LS transfer at 10 seconds and lighting came to full brightness at normal loss.
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/31/2019 (10:00 - 12:00) | 12/31/2019 (AM) | 12/31/2019 |
Corrections:
Miscellaneous/Other
Comment Only
12/31/2019
Office wall RI phase 2 , 1st and 2nd floors.
|
||||
Electrical Rough-in Inspection | Partial Pass | 1/15/2020 (12:30 - 2:30) | 1/15/2020 (PM) | 01/15/2020 |
Corrections:
Miscellaneous/Other
Comment Only
01/15/2020
Wall RI for bathrooms and two offices spaces.
|
||||
Electrical Rough-in Inspection | Partial Pass | 1/30/2020 (2:30 - 3:30) | 1/30/2020 (PM) | 01/30/2020 |
Corrections:
Miscellaneous/Other
Comment Only
01/30/2020
2 nd floor wall RI- ok
|
||||
Lighting Inspection Sign | Passed | 02/17/2020 | ||
RBCU Parking lot lighting 9550 Lyndale | ||||
Electrical Rough-in Inspection | Partial Pass | 3/5/2020 (12:30 - 2:30) | 3/5/2020 (PM) | 03/05/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/05/2020
2nd floor above ceiling - ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/18/2020 (8:00 - 10:00) | 3/18/2020 (AM) | 03/18/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/18/2020
1st level Above ceiling- ok
Service panel disconnect- ok
|
||||
Electrical Final Inspection | Passed | 4/8/2020 (10:00 - 12:00) | 4/8/2020 (AM) | 04/08/2020 |
Corrections:
Miscellaneous/Other
Comment Only
04/08/2020
Final for bank- ok
GFCI- ok
|
||||
Electrical Final Inspection | Passed | 04/23/2020 | ||
Corrections:
Miscellaneous/Other
Outstanding
12/19/2019
Available fault currents marked on equipment far exceed ratings of the equipment.
|
||||
Miscellaneous/Other
Outstanding
12/19/2019
Secondary side of transformer has no OCP for panel board. per NEC 408.36B
|
||||
Miscellaneous/Other
Outstanding
12/19/2019
Verify generator feeder sizing and grounding / bonding. Transfer switches are 4 pole and would require generator to have GEC installed.
|
||||
Miscellaneous/Other
Outstanding
12/19/2019
GEC for transformer installed in EMT needs to be bonded at each end or be installed in non-ferrous metallic raceway.
|
||||
Electrical Rough-in Inspection | Passed | 04/23/2020 | ||
Corrections:
Miscellaneous/Other
Outstanding
12/10/2019
Attach fixtures to grid
|
||||
Miscellaneous/Other
Outstanding
12/10/2019
Remove temp wiring in ceiling.
|