PREL201909849
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 8/29/2019 (10:00 - 12:00) | 8/29/2019 (PM) | 08/29/2019 |
Corrections:
Miscellaneous/Other
Comment Only
08/29/2019
Met contractor on site. Permit was required for work done previously by others- lack of proper licensing.
Walk through with contractor.
Some areas not visible. Inspector to verify if any of the above ceiling areas to be used as a return air plenum as non-plenum cable was installed.
Visual OK.
Permit to remain open until completion of the installations.
Any work by others would require new/separate permit and inspections.
|
||||
Electrical Rough-in Inspection | Passed | 01/29/2020 | ||
Electrical Final Inspection | Passed | 01/29/2020 |