PREL201911845
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Partial Pass | 11/26/2019 (12:30 - 2:30) | 11/26/2019 (PM) | 11/26/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
11/26/2019
Need available fault current and verify rating matches
|
||||
Miscellaneous/Other
Carried Forward
11/26/2019
Need 4 insulated conductors feeding trailers per NEC 550
|
||||
Miscellaneous/Other
Carried Forward
11/26/2019
Trailer frames need to be bonded to ground rods
|
||||
Electrical Final Inspection | Passed | 2/10/2020 (8:00 - 10:00) | 2/10/2020 (AM) | 02/10/2020 |
Corrections:
Miscellaneous/Other
Resolved
02/10/2020
Need available fault current and verify rating matches
|
||||
Miscellaneous/Other
Resolved
02/10/2020
Need 4 insulated conductors feeding trailers per NEC 550
|
||||
Miscellaneous/Other
Resolved
02/10/2020
Trailer frames need to be bonded to ground rods
|
||||
Miscellaneous/Other
Comment Only
02/10/2020
Visual only, limited access due to snow.
|