PREL201914593
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Passed | 12/30/2019 (12:30 - 2:30) | 12/30/2019 (PM) | 12/30/2019 |
Electrical Final Inspection | Passed | 7/16/2020 (8:00 - 10:00) | 7/16/2020 (AM) | 07/16/2020 |
Corrections:
Miscellaneous/Other
Comment Only
07/16/2020
Final OK - verbal- verify lockable means for transformer primary. Must be lockable in the off position.
|