PREL201914661
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 12/16/2019 (8:00 - 10:00) | 12/16/2019 (AM) | 12/16/2019 |
Corrections:
Miscellaneous/Other
Comment Only
12/16/2019
Phased project- Wall RI OK
Spoke to superintendent for GC-
Fire alarm cabling and Temperature control installation requires separate electrical permits and inspection.
|
||||
Electrical Rough-in Inspection | Partial Pass | 1/10/2020 (10:00 - 12:00) | 1/10/2020 (AM) | 01/10/2020 |
Corrections:
Miscellaneous/Other
Comment Only
01/10/2020
Power and lighting ok above ceiling
|
||||
Electrical Final Inspection | Partial Pass | 1/27/2020 (8:00 - 10:00) | 1/27/2020 (AM) | 01/27/2020 |
Corrections:
Miscellaneous/Other
Comment Only
01/27/2020
Phased project with work on three different floors- electrical contractor has a separate electrical permit for each floor. Building contractor has a single permit for all three floors.
Phase one - 3rd floor partial pass for final
Partition furniture to hook up and a additional phase later in the year to complete.
Call for inspection as work progresses.
|
||||
Electrical Rough-in Inspection | Partial Pass | 6/30/2020 (8:00 - 10:00) | 6/30/2020 (AM) | 06/30/2020 |
Corrections:
Miscellaneous/Other
Comment Only
06/30/2020
Above ceiling RI OK for power and lighting.
|
||||
Electrical Rough-in Inspection | Passed | 7/8/2020 (8:00 - 10:00) | 7/8/2020 (AM) | 07/08/2020 |
Corrections:
Miscellaneous/Other
Comment Only
07/08/2020
3rd floor- partial pass. Partitions to connect.
|
||||
Electrical Final Inspection | Passed | 08/25/2020 |