PREL201914864
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 3/9/2020 (8:00 - 10:00) | 3/9/2020 (AM) | 03/09/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/09/2020
Site visit OK. Partial pass at underground- installations to be phased
|
||||
Electrical Rough-in Inspection | Partial Pass | 5/6/2020 (8:00 - 10:00) | 5/6/2020 (AM) | 05/07/2020 |
Corrections:
Miscellaneous/Other
Comment Only
05/07/2020
Site visit and routine progress inspection. Viewed electrical room where new distribution equipment is set- discussed working clearances and egress at site.
General Foreman has set up site meeting with contractor, electrical engineer of record and AHJ to review and discuss.
Discussed equipment grounding provisions at large metal pull box enclosures with JW on the site.
|
||||
Electrical Rough-in Inspection | Partial Pass | 05/12/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
05/12/2020
Meeting at site- equipment set in place to date- Clearance OK.
Reviewed gen-set for NRTL listing- OK.
|
||||
Electrical Rough-in Inspection | Partial Pass | 5/28/2020 (12:30 - 2:30) | 5/28/2020 (PM) | 05/29/2020 |
Released 13.8 KV feeders to Xcel for connection/energize tmiller 06/01/2020 8:49 AM | ||||
Corrections:
Miscellaneous/Other
Comment Only
05/29/2020
13,800 volt distribution inspection OK- OK to notify Xcel Energy to energize
|
||||
Electrical Rough-in Inspection | Partial Pass | 6/25/2020 (12:30 - 2:30) | 6/25/2020 (PM) | 06/25/2020 |
Corrections:
Miscellaneous/Other
Comment Only
06/25/2020
Site visit and progress inspection.
Chillers rated at 65 K SCCR- verify available fault current per Electrical Engineer.
|
||||
Electrical Rough-in Inspection | Partial Pass | 7/16/2020 (10:00 - 12:00) | 7/16/2020 (AM) | 07/16/2020 |
Corrections:
Miscellaneous/Other
Comment Only
07/16/2020
Site meeting with contractor OK. Progress inspection OK. UPS distribution equipment OK. Transformer T8100 OK.
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/13/2020 (10:00 - 12:00) | 8/13/2020 (AM) | 08/13/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/13/2020
Progress inspection- reviewed installations through out facility.
Main electrical room, east equipment room. Site visit- OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/26/2020 (10:00 - 12:00) | 8/26/2020 (AM) | 08/26/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/26/2020
Routine- fire alarm testing with code officials. Results on fire alarm permit by fire inspector.
|
||||
Electrical Final Inspection | Partial Pass | 8/28/2020 (10:00 - 12:00) | 8/28/2020 (AM) | 08/28/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/28/2020
Partial- lifesafety generator test OK
|
||||
Electrical Final Inspection | Partial Pass | 10/1/2020 (12:30 - 2:30) | 10/1/2020 (PM) | 10/01/2020 |
10-1: Partial final. SNT | ||||
Corrections:
Miscellaneous/Other
Comment Only
10/01/2020
Progress inspection.
Roof top equipment inspection pending.
Provide all code required labels & documentation.
GFPE documentation required. Labels at manual transfer switch and for locations of all services and back up sources of power required.
|
||||
Electrical Final Inspection | Passed | 10/7/2020 (12:30 - 2:30) | 10/7/2020 (PM) | 10/15/2020 |
Corrections:
Miscellaneous/Other
Outstanding
10/15/2020
Verbal corrections at final inspection. Contractor will be on site until all corrections and installations are completed.
1. Plaques at service locations indicating the service is 1 of …. ( how many ) and the location of the other services.
2. Even though you can see there is a gen-set- the NEC requires signage indicating that there is an alternate source…this is required at the service location) -however- with the service being 13.8 K – it may be wise to place additional signage at the main electrical room.
3. Informational note- I did email both the fire marshal and fire chief for Bloomington- asking what signs & plaques and at what locations would best help first responders- know what to do in an emergency.
4. The manual transfer switch is required to annunciate at remote location ( to be determined by others ) when the switch is any position other than “normal.” Additionally, there should be an indication of whether the phase rotation is clockwise or counter-clockwise.
5. Mark and I discussed the grounding/bonding of the parking lot poles- I understand that there is an equipment grounding conductor brought to the luminaire and that in turn the luminaire has some sort of mechanical connection to the pole. The NEC in 410.3 (B) (a) has a requirement for a bonding lug to be present at the pole handhole- evidently the spec did not call for this provision. I emailed both Mark and Todd Grube and am willing to wait for a final determination. However I have always required the bonding at a lug for “grounding” the pole, as the connections at the luminaire to the pole are subject to environmental conditions that can/will degrade over time- hence the requirement.
|
||||
Electrical Rough-in Inspection | Passed | 10/15/2020 |