PREL202000690
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 3/25/2020 (12:30 - 2:30) | 3/25/2020 (PM) | 03/25/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
03/25/2020
Health care phase l garage underground
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/28/2020 (12:30 - 2:30) | 4/28/2020 (PM) | 04/28/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
04/28/2020
Health care phase l garage underground
|
||||
Miscellaneous/Other
Carried Forward
04/28/2020
Health care underground RI
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/25/2020 (10:00 - 12:00) | 8/25/2020 (AM) | 08/25/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
08/25/2020
Health care phase l garage underground
|
||||
Miscellaneous/Other
Carried Forward
08/25/2020
Health care underground RI
|
||||
Miscellaneous/Other
Carried Forward
08/25/2020
Entry ceiling ri
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/14/2020 (12:30 - 2:30) | 9/14/2020 (PM) | 09/15/2020 |
Corrections:
Miscellaneous/Other
Resolved
09/15/2020
Health care phase l garage underground
|
||||
Miscellaneous/Other
Resolved
09/15/2020
Health care underground RI
|
||||
Miscellaneous/Other
Resolved
09/15/2020
Entry ceiling ri
|
||||
Miscellaneous/Other
Comment Only
09/15/2020
Phase 1 Health Care Center Building,: RI OK at 3rd floor all units/ sleeping rooms, common areas and all hard lid ceiling areas.
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/24/2020 | 9/24/2020 (PM) | 09/24/2020 |
Corrections:
Miscellaneous/Other
Comment Only
09/24/2020
RI OK at @ 2nd floor units and corridor. RI OK at common areas as signed off with local inspection sheet(s).
Call for inspection for any above ceiling areas or common areas that were not ready at this inspection.
Verbal to site foreman: Strap all MC cable to code- misc. runs at ceiling areas in some units lack proper spaced straps.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/8/2020 (8:00 - 10:00) | 10/8/2020 (AM) | 10/08/2020 |
Corrections:
Miscellaneous/Other
Comment Only
10/08/2020
Parking garage level: Kitchen wall RI OK.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/16/2020 (12:30 - 2:30) | 10/16/2020 (PM) | 10/19/2020 |
Corrections:
Miscellaneous/Other
Comment Only
10/19/2020
RI OK at 1st floor units, corridor and misc. small office areas.
Large common areas not ready- call for inspection when installations are complete.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/30/2020 (12:30 - 2:30) | 10/30/2020 (PM) | 10/30/2020 |
Corrections:
Miscellaneous/Other
Comment Only
10/30/2020
1st floor common areas - wall RI OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 11/3/2020 (Afternoon) | 11/3/2020 (PM) | 11/03/2020 |
Corrections:
Miscellaneous/Other
Comment Only
11/03/2020
Site visit/ progress inspection only
|
||||
Electrical Rough-in Inspection | Partial Pass | 11/17/2020 (10:00 - 12:00) | 11/17/2020 (AM) | 11/17/2020 |
Corrections:
Miscellaneous/Other
Comment Only
11/17/2020
RI OK at: outside canopy lighting, 1st floor fireplace common area hard lid ceiling, 2nd floor elevators lobby soffits, 3rd floor corridor complete, 3rd floor elevator lobby.
|
||||
Electrical Rough-in Inspection | Partial Pass | 11/24/2020 (8:00 - 10:00) | 11/24/2020 (AM) | 11/24/2020 |
Corrections:
Miscellaneous/Other
Comment Only
11/24/2020
3000 AMP 120/208 volt- 3 phase UG Commercial service OK to release to Xcel
|
||||
Miscellaneous/Other
Comment Only
11/24/2020
Above ceiling RI OK at hard lid ceilings, multiple locations on the first level
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/1/2020 (12:30 - 2:30) | 12/1/2020 (PM) | 12/01/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/01/2020
2nd floor corridor above drop ceil OK. 3rd floor large common area above ceiling RI OK.
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/4/2020 (10:00 - 12:00) | 12/4/2020 (AM) | 12/04/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/04/2020
Meet contractor on -site: Generator is listed & labeled. System bonding conductor has been removed/disconnected. 3 pole transfer switches installed. GEC supplemental connection to frame of gen-set OK.
Manual transfer for EM system is in place- check annunciation and required labeling at subsequent inspection. Reviewed elevator distribution at main electrical room. Reviewed legally required transfer switch and distribution at main electrical room. Exiting and panic hardware present at main electrical room.
|
||||
Miscellaneous/Other
Outstanding
12/04/2020
Inspector note- any series rated panelboards require labeling per and to code.
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/8/2020 (12:30 - 2:30) | 12/8/2020 (PM) | 12/08/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/08/2020
3rd floor units- final OK at # 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 314, 315, 316, 317, 318, 320.
|
||||
Maximum OCP per manufacturer nameplate exceeded- A/C unit “overfused”
Outstanding
12/08/2020
Maximum OCP per manufacturer nameplate exceeded- HVAC unit “overfused”
at units # 301, 313, 321.
|
||||
Miscellaneous/Other
Outstanding
12/08/2020
Units 301, 302, 319, 321 no power/ or not ready
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/9/2020 (10:00 - 12:00) | 12/9/2020 (AM) | 12/09/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/09/2020
Progress inspection- Units on 2nd floor-
Units # 202, 203, 204, 205, 206, 207, 208, 209, 210, 211, 212, 213, 214, 215, 216, 217, 218, 219, 220 - Final OK. Units 201 and 221 not ready.
|
||||
Miscellaneous/Other
Resolved
12/09/2020
VOID
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/10/2020 (12:30 - 2:30) | 12/10/2020 (PM) | 12/11/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/11/2020
Progress inspection: 1st floor above ceiling- corridor/link and some common areas.
2nd and 3rd floor above ceiling RI - complete OK.
Review of roof top HVAC installations- wiring OK. Verify OCP at units are per nameplate.
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/11/2020 (10:00 - 12:00) | 12/11/2020 (AM) | 12/11/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/11/2020
Progress inspection_ 1st floor sleeping rooms walk through and plug checks OK at - Units 126, 125, 123, 121, 119, 117, 120, 122, 124, 116, 115, 114, 113, 112, 111, 110, 109, 108, 107.
|
||||
Electrical Final Inspection | Partial Pass | 12/15/2020 (12:30 - 2:30) | 12/15/2020 (PM) | 12/15/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/15/2020
Progress inspection. 1st floor above drop ceilings OK.
|
||||
Electrical Final Inspection | Partial Pass | 12/16/2020 (12:30 - 2:30) | 12/16/2020 (PM) | 12/16/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/16/2020
Progress inspection: 1st floor above ceiling OK.
Boiler room walk thru and site visit to parking garage.
OK
|
||||
Electrical Final Inspection | Partial Pass | 12/17/2020 (12:30 - 2:30) | 12/17/2020 (PM) | 12/17/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/17/2020
Progress OK
|
||||
Electrical Final Inspection | Partial Pass | 12/18/2020 (12:30 - 2:30) | 12/18/2020 (PM) | 12/18/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/18/2020
Progress inspection- remaining sleeping unit rooms on first floor- plug checks OK/ spot checking only -as much storage in some areas.
|
||||
Miscellaneous/Other
Comment Only
12/18/2020
1st floor above drop ceiling OK at link area.
|
||||
Electrical Final Inspection | Partial Pass | 12/22/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/22/2020
Partial pass- life safety generator test- OK
|
||||
Electrical Final Inspection | Partial Pass | 1/15/2021 (12:30 - 2:30) | 1/15/2021 (PM) | 01/15/2021 |
Corrections:
Miscellaneous/Other
Comment Only
01/15/2021
Final OK at main kitchen, supplemental kitchen for dining room, pantry.
Provide breaker lock-off for equipment pieces lacking local disconnect means.
RI OK at remaining elevator lobbies- adjacent to Phase 2.
|
||||
Electrical Rough-in Inspection | Partial Pass | 1/19/2021 (12:30 - 2:30) | 1/19/2021 (PM) | 01/20/2021 |
Corrections:
Miscellaneous/Other
Comment Only
01/20/2021
Progress inspection- walk through- pre final.
Verbal repair reverse polarity at stand-by receptacle outlet- at unit #110.
Check spa tub GFCI at next inspection.
|
||||
Electrical Rough-in Inspection | Passed | 01/22/2021 | ||
Corrections:
Miscellaneous/Other
Comment Only
01/22/2021
All RI inspections for Phase 1 complete.
See separate electrical permit to different electrical contractor for Phase 2 construction of the building.
|
||||
Electrical Final Inspection | Partial Pass | 01/22/2021 | ||
Corrections:
Miscellaneous/Other
Comment Only
01/22/2021
Site visit/ progress inspections.
1. Verbal to data contractor- relocate equipment at main electrical room to maintain clear and unobstructed egress per code.
2. Relocate GFCI protection at HVAC service receptacles at parking garage to be readily accessible- 2 locations.
3. Verbal discussion on labeling for series rated equipment.
4. Visual OK on limited energy transformer used for wireless nurse call- properly listed/label and Class 2.
|
||||
Miscellaneous/Other
Carried Forward
01/22/2021
Items to close out/final inspection approval:
1. Walk through all electrical room/panel location to verify all directories and labels are installed.
2. Verify GFCI for spa.
|
||||
Electrical Final Inspection | Passed | 2/3/2021 (10:00 - 12:00) | 2/3/2021 (AM) | 02/03/2021 |
Corrections:
Miscellaneous/Other
Resolved
02/03/2021
Items to close out/final inspection approval:
1. Walk through all electrical room/panel location to verify all directories and labels are installed.
2. Verify GFCI for spa.
|
||||
Miscellaneous/Other
Comment Only
02/03/2021
Phase one building.
Electrical final inspection approved.
|