PREL202001090
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 2/28/2020 (10:00 - 12:00) | 2/28/2020 (AM) | 02/28/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
02/28/2020
Phased project- phase one wall RI OK.
At ceiling- existing fixture whips. Fasten luminaires to grid per code.
Note to general contractor- in areas have abandoned low voltage cable demolished and provide/ maintain independent supported
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/13/2020 (12:30 - 2:30) | 3/13/2020 (PM) | 03/13/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
03/13/2020
Phased project- phase one wall RI OK.
At ceiling- existing fixture whips. Fasten luminaires to grid per code.
Note to general contractor- in areas have abandoned low voltage cable demolished and provide/ maintain independent supported
|
||||
Miscellaneous/Other
Carried Forward
03/13/2020
Above ceiling: inspector left note for general contractor:
1. have all abandoned limited energy cables ( voice/data ) demolished.
2. Temperature control wiring- this scope of work requires electrical permit and inspection. remove/replace all non-plenum cable.
3. provide and maintain support of all existing voice/data cable
|
||||
Miscellaneous/Other
Carried Forward
03/13/2020
All ceiling tile has not been removed-
Replace wiring in makeshift raceway. Pointed out to wireman on the job.
There are existing installations - done previously by others- at open tiles support raceways, boxes and MC cable to code.
|
||||
Miscellaneous/Other
Carried Forward
03/13/2020
Verify egress illumination complies with code- see NEC 700.12
|
||||
Miscellaneous/Other
Comment Only
03/13/2020
Partial pass above ceiling pending corrections and work by others.
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/24/2020 (8:00 - 10:00) | 3/24/2020 (AM) | 03/24/2020 |
Corrections:
Miscellaneous/Other
Resolved
03/24/2020
Phased project- phase one wall RI OK.
At ceiling- existing fixture whips. Fasten luminaires to grid per code.
Note to general contractor- in areas have abandoned low voltage cable demolished and provide/ maintain independent supported
|
||||
Miscellaneous/Other
Resolved
03/24/2020
Above ceiling: inspector left note for general contractor:
1. have all abandoned limited energy cables ( voice/data ) demolished.
2. Temperature control wiring- this scope of work requires electrical permit and inspection. remove/replace all non-plenum cable.
3. provide and maintain support of all existing voice/data cable
|
||||
Miscellaneous/Other
Resolved
03/24/2020
All ceiling tile has not been removed-
Replace wiring in makeshift raceway. Pointed out to wireman on the job.
There are existing installations - done previously by others- at open tiles support raceways, boxes and MC cable to code.
|
||||
Miscellaneous/Other
Carried Forward
03/24/2020
Verify egress illumination complies with code- see NEC 700.12
|
||||
Miscellaneous/Other
Comment Only
03/24/2020
Phased project- phase one above ceiling OK
|
||||
Electrical Final Inspection | Partial Pass | 3/24/2020 (10:00 - 12:00) | 3/24/2020 (AM) | 03/24/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
03/24/2020
Phased project- phase one OK
Verify egress lighting is functioning and complies with 700.12
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/9/2020 (12:30 - 2:30) | 4/9/2020 (PM) | 04/09/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
04/09/2020
Verify egress illumination complies with code- see NEC 700.12
|
||||
Miscellaneous/Other
Comment Only
04/09/2020
Phase 2 wall RI- at area outside of elevators
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/30/2020 (12:30 - 2:30) | 4/30/2020 (PM) | 05/01/2020 |
Corrections:
Miscellaneous/Other
Comment Only
05/20/2020
Verify egress illumination complies with code- see NEC 700.12
|
||||
Miscellaneous/Other
Comment Only
05/20/2020
Partial pass for above ceiling at Phase 2-
Met general contractor on the site:
one open J- box and CMP HDMI cable laying on ceiling tile.
Remove non Plenum rated HDMI cable from ceiling to floor opening
Check at next inspection.
|
||||
Electrical Final Inspection | Passed | 5/20/2020 (8:00 - 10:00) | 5/20/2020 (AM) | 05/20/2020 |
Corrections:
Miscellaneous/Other
Comment Only
05/20/2020
Phased project- phase one OK
Verify egress lighting is functioning and complies with 700.12
|