PREL202001916
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Final Inspection | Pending | |||
| Electrical Rough-in Inspection | Pending | |||
|
Corrections:
Miscellaneous/Other
Outstanding
03/10/2020
Verify listings of temp control equipment
|
||||
| Electrical Rough-in Inspection | Partial Pass | 3/9/2020 (Afternoon) | 3/9/2020 (PM) | 03/10/2020 |
|
Corrections:
Miscellaneous/Other
Carried Forward
03/10/2020
Verify listings of temp control equipment
|
||||