PREL202003067
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Pending | |||
Electrical Final Inspection | Pending | |||
Electrical Rough-in Inspection | Partial Pass | 09/16/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/16/2020
Assisted living building: RI OK for FA cable installs at 3rd floor phase 1.
|
||||
Electrical Rough-in Inspection | Partial Pass | 09/24/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/24/2020
RI OK at @ 2nd floor units and corridor. RI OK at common areas as signed off with local inspection sheet(s).
Call for inspection for any above ceiling areas or common areas that were not ready at this inspection.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/19/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
10/19/2020
FA cable work Phase 1 - first floor units, corridor and small common areas RI OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 11/17/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
11/17/2020
Progress inspection for FA cable installations OK.
1st floor fireplace common area hard lid ceiling, 2nd floor elevator lobby, 3rd floor corridor ceiling, 3rd floor elevator lobby.
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/01/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/01/2020
Progress inspection - 2nd floor above ceiling.
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/18/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/18/2020
There have been a number of progress inspections performed while inspector on site for separate electrical permit- all rough-in inspections for Phase 1 OK.
Partial pass result- as this permit is valid for both phases of construction.
|
||||
Electrical Final Inspection | Partial Pass | 12/22/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/22/2020
Partial pass- for FA cable installations at Phase one.
|