Summary

PREL202009118
Electrical
Finaled
CITY OF BLOOMINGTON
Alteration/Repair/Replace
Existing cabinet 120/240v three phase.
08/18/2020
08/20/2020
05/22/2022
11/23/2021

Locations

Permits

Permit Number: PREL202009118

Electrical
Finaled
08/20/2020
05/22/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Passed 9/17/2020 (12:30 - 2:30) 9/17/2020 (PM) 09/17/2020
Corrections:


Miscellaneous/Other
Comment Only
09/17/2020
GEC bonding at rebar - ok

Electrical Final Inspection Partial Pass 5/13/2021 (12:30 - 2:30) 5/13/2021 (PM) 05/13/2021
Corrections:


Miscellaneous/Other
Carried Forward
05/13/2021
Need supply side bonding jumper in CT can.

Miscellaneous/Other
Carried Forward
05/13/2021
Need metal piping with GEC bonded to GEC.

Miscellaneous/Other
Resolved
05/13/2021
Need supply side bonding jumper in CT can.

Miscellaneous/Other
Resolved
05/13/2021
Need metal piping with GEC bonded to GEC.

Miscellaneous/Other
Comment Only
05/13/2021
Xcel contacted. Need available fault current proper labeling for finals

Electrical Final Inspection Passed 11/23/2021 (8:00 - 10:00) 11/23/2021 (AM) 11/23/2021
Corrections:


Miscellaneous/Other
Resolved
11/23/2021
Need supply side bonding jumper in CT can.

Miscellaneous/Other
Resolved
11/23/2021
Need metal piping with GEC bonded to GEC.