Permit Application Status

PREL202010352


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202010352
Electrical
Expired
THERMO KING CORPORATION
Alteration/Repair/Replace
1st, 2nd, and 3rd floor remodel. Replace electrical service.
09/10/2020
10/14/2020
09/27/2021

Locations

Permits

Permit Number: PREL202010352

Electrical
Expired
10/14/2020
09/27/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 10/21/2020 (12:30 - 2:30) 10/21/2020 (PM) 10/21/2020
Corrections:


Miscellaneous/Other
Comment Only
10/21/2020
2nd floor wall RI- ok

Electrical Rough-in Inspection Partial Pass 10/30/2020 (12:30 - 2:30) 10/30/2020 (PM) 10/30/2020
Corrections:


Miscellaneous/Other
Comment Only
10/30/2020
1st floor wall RI- ok

Electrical Rough-in Inspection Partial Pass 11/20/2020 (8:00 - 10:00) 11/20/2020 (AM) 11/20/2020
Corrections:


Miscellaneous/Other
Carried Forward
11/20/2020
4 conference rooms on lower level require additional outlets. Email sent to contractor

Electrical Rough-in Inspection Partial Pass 1/20/2021 (10:00 - 12:00) 1/20/2021 (AM) 01/20/2021
Corrections:


Miscellaneous/Other
Carried Forward
01/20/2021
4 conference rooms on lower level require additional outlets. Email sent to contractor

Miscellaneous/Other
Comment Only
01/20/2021
Above ceiling 1st and 2nd floor- ok

Electrical Rough-in Inspection Passed 1/29/2021 (2:30 - 3:30) 1/29/2021 (PM) 02/02/2021
Corrections:


Miscellaneous/Other
Outstanding
01/20/2021
4 conference rooms on lower level require additional outlets. Email sent to contractor

Miscellaneous/Other
Comment Only
02/02/2021
Panel inspection and transformer. Lower level above ceiling.

Electrical Rough-in Inspection Passed 3/16/2021 (12:30 - 2:30) 3/16/2021 (PM) 03/16/2021
Corrections:


Miscellaneous/Other
Comment Only
03/16/2021
Above ceiling- ok

Electrical Final Inspection Partial Pass 3/17/2021 (10:00 - 12:00) 3/17/2021 (AM) 03/17/2021
Corrections:


Miscellaneous/Other
Comment Only
03/17/2021
Final for basement and first level- ok

Electrical Final Inspection Passed 3/31/2021 (12:30 - 2:30) 3/31/2021 (PM) 03/31/2021
Corrections:


Miscellaneous/Other
Comment Only
03/31/2021
Final for office areas- ok