PREL202011075
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 2/25/2021 (8:00 - 10:00) | 2/25/2021 (AM) | 02/25/2021 |
Corrections:
Miscellaneous/Other
Comment Only
02/25/2021
Ceiling RI 3rd and 4th
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/8/2021 (8:00 - 10:00) | 3/8/2021 (AM) | 03/08/2021 |
Corrections:
Miscellaneous/Other
Comment Only
03/08/2021
Ceiling inspection for 2nd and 3rd
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/10/2021 (8:00 - 10:00) | 3/10/2021 (AM) | 03/10/2021 |
Corrections:
Miscellaneous/Other
Comment Only
03/10/2021
2nd floor ceiling- ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/11/2021 (8:00 - 10:00) | 3/11/2021 (AM) | 03/11/2021 |
Corrections:
Miscellaneous/Other
Comment Only
03/11/2021
UG- ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/12/2021 (8:00 - 10:00) | 3/12/2021 (AM) | 03/12/2021 |
Corrections:
Miscellaneous/Other
Comment Only
03/12/2021
Euffer grounding- ok
|
||||
Electrical Rough-in Inspection | Passed | 3/31/2021 (8:00 - 10:00) | 3/31/2021 (AM) | 03/31/2021 |
Corrections:
Miscellaneous/Other
Comment Only
03/31/2021
1st floor ceiling RI- ok
|
||||
Electrical Final Inspection | Partial Pass | 4/7/2021 (8:00 - 10:00) | 4/7/2021 (AM) | 04/07/2021 |
Electrical Rough-in Inspection | Partial Pass | 4/13/2021 (12:30 - 2:30) | 4/13/2021 (PM) | 04/13/2021 |
Corrections:
Miscellaneous/Other
Resolved
04/15/2021
Service inspection:
1. Improper grounding electrode sizing to building frame.
Improper bonding jumpers to building metal water piping.
Size based on combined area of unfused phase conductors. 1500 KCMIL
|
||||
Miscellaneous/Other
Resolved
04/15/2021
Bond at CT enclosure.
|
||||
Miscellaneous/Other
Resolved
04/15/2021
Improper main bonding jumper at service.
|
||||
Miscellaneous/Other
Resolved
04/15/2021
At 112.5 KVA transformer: Improper equipment bonding jumper size. Size based on the 250 KCMIL conductors.
Improper system bonding jumper- size based on the combined area of the derived phase conductors- size per total KCMIL area per phase.
Improper GEC size for transformer.
|
||||
Miscellaneous/Other
Comment Only
04/13/2021
Wall RI OK at showroom and bathrooms.
|
||||
Miscellaneous/Other
Resolved
04/15/2021
Call for re-inspection of service.
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/15/2021 (10:00 - 12:00) | 4/15/2021 (AM) | 04/15/2021 |
Corrections:
Miscellaneous/Other
Comment Only
04/15/2021
Trench & UG OK at parking lot for lighting and Tele-Co
|
||||
Miscellaneous/Other
Comment Only
04/15/2021
Trench & UG OK at parking lot for lighting and Tele-Co
|
||||
Miscellaneous/Other
Comment Only
04/15/2021
Transformer and service corrections OK.
Ok to release the service to Xcel.
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/23/2021 (10:00 - 12:00) | 4/23/2021 (AM) | 04/23/2021 |
Corrections:
Miscellaneous/Other
Comment Only
04/23/2021
Above ceilings- ok
|
||||
Electrical Rough-in Inspection | Passed | 6/2/2021 (8:00 - 10:00) | 6/2/2021 (AM) | 06/02/2021 |
Corrections:
Miscellaneous/Other
Comment Only
06/02/2021
Above ceiling- ok
|
||||
Electrical Final Inspection | Partial Pass | 6/11/2021 (12:30 - 2:30) | 6/11/2021 (PM) | 06/11/2021 |
Corrections:
Miscellaneous/Other
Carried Forward
06/11/2021
Ok to temp occupy office and garage area only. Pending building inspection.
|
||||
Electrical Final Inspection | Not Ready | 6/23/2021 (12:30 - 2:30) | 6/23/2021 (PM) | 06/23/2021 |
Electrical Final Inspection | Partial Pass | 7/14/2021 (12:30 - 2:30) | 7/14/2021 (PM) | 07/14/2021 |
Corrections:
Miscellaneous/Other
Carried Forward
08/12/2021
Fixture guarding maybe required for outline lighting around windows.
|
||||
Electrical Final Inspection | Passed w/ Conditions | 7/27/2021 (10:00 - 12:00) | 7/27/2021 (AM) | 07/27/2021 |
Corrections:
Miscellaneous/Other
Resolved
07/27/2021
Ok to temp occupy office and garage area only. Pending building inspection.
|
||||
Miscellaneous/Other
Outstanding
07/27/2021
Rooftop GFCI require WR rating.
T5 lights on sides of show windows require protection. A minimum plastic bulb cover required.
|
||||
Miscellaneous/Other
Comment Only
07/27/2021
Ok to occupy pending building inspection.
|
||||
Electrical Final Inspection | Passed | 8/13/2021 (3:30 - 4:00) | 8/13/2021 (PM) | 08/13/2021 |
Corrections:
Miscellaneous/Other
Resolved
08/13/2021
Fixture guarding maybe required for outline lighting around windows.
|
||||
Miscellaneous/Other
Comment Only
08/13/2021
Final for electrical- ok
|