Permit Application Status

PREL202012308


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202012308
Electrical
Finaled
SKYWATER TECH FOUNDRY INC
Other
Manufacturing Tool Installation: AMAT Producer, in FAB D
10/09/2020
10/12/2020
08/03/2021
02/04/2021

Locations

Permits

Permit Number: PREL202012308

Electrical
Finaled
10/12/2020
08/03/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 10/15/2020 (12:30 - 2:30) 10/15/2020 (PM) 10/15/2020
Corrections:


Miscellaneous/Other
Carried Forward
10/15/2020
Tool lacks NRTL listing. There are multiple pieces of apparatus that combined make up the tool. Some of the apparatus are listed/labeled by NRTL. Tool requires independent 3rd party evaluation.

Miscellaneous/Other
Comment Only
10/15/2020
Met foreman at site: Verbal for sizing of supply side bonding jumper. Visual OK at field wiring installations.

Electrical Rough-in Inspection Passed 02/04/2021
Corrections:


Miscellaneous/Other
Outstanding
10/15/2020
Tool lacks NRTL listing. There are multiple pieces of apparatus that combined make up the tool. Some of the apparatus are listed/labeled by NRTL. Tool requires independent 3rd party evaluation.

Electrical Final Inspection Passed 02/04/2021
Corrections:


Miscellaneous/Other
Comment Only
02/04/2021
Independent 3rd party evaluation received.