PREL202012382
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Passed | 10/28/2020 (8:00 - 10:00) | 10/28/2020 (AM) | 10/28/2020 |
Corrections:
Miscellaneous/Other
Comment Only
10/28/2020
Two separate tools-
RI OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/28/2020 | 10/28/2020 (AM) | 10/28/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
10/28/2020
Verify grounding electrode conductor requirements ( if any ) for SEZ 404 Tool.
Verify listing or independent 3rd party evaluation(s) for the tool(s) in their entirety.
Wiring except as noted- visual OK.
|
||||
Electrical Final Inspection | Failed | 11/2/2020 (8:00 - 10:00) | 11/2/2020 (AM) | 11/02/2020 |
Corrections:
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
11/02/2020
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified.
At equipment with factory transformer- GEC installed and connected.
|
||||
Electrical Final Inspection | Not Ready | 4/13/2021 | 4/13/2021 (AM) | 04/14/2021 |
Corrections:
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
04/14/2021
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified.
At equipment with factory transformer- GEC installed and connected.
|
||||
Miscellaneous/Other
Carried Forward
04/14/2021
Inspector emailed independent 3rd party engineer to verify status of evaluation report. 04/14/2021
|
||||
Electrical Final Inspection | Passed | 6/29/2023 (10:00 - 12:00) | 6/29/2023 (AM) | 06/29/2023 |
Corrections:
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Resolved
06/29/2023
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified.
At equipment with factory transformer- GEC installed and connected.
|
||||
Miscellaneous/Other
Resolved
06/29/2023
Inspector emailed independent 3rd party engineer to verify status of evaluation report. 04/14/2021
|