Permit Application Status

PREL202012382


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202012382
Electrical
Finaled
SKYWATER TECH FOUNDRY INC
Alteration/Repair/Replace
Install of the SEZ/SCRUB machine for Skywater
10/09/2020
10/15/2020
12/26/2023
06/29/2023

Locations

Permits

Permit Number: PREL202012382

Electrical
Finaled
10/15/2020
12/26/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Passed 10/28/2020 (8:00 - 10:00) 10/28/2020 (AM) 10/28/2020
Corrections:


Miscellaneous/Other
Comment Only
10/28/2020
Two separate tools- RI OK

Electrical Rough-in Inspection Partial Pass 10/28/2020 10/28/2020 (AM) 10/28/2020
Corrections:


Miscellaneous/Other
Carried Forward
10/28/2020
Verify grounding electrode conductor requirements ( if any ) for SEZ 404 Tool. Verify listing or independent 3rd party evaluation(s) for the tool(s) in their entirety. Wiring except as noted- visual OK.

Electrical Final Inspection Failed 11/2/2020 (8:00 - 10:00) 11/2/2020 (AM) 11/02/2020
Corrections:


All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
11/02/2020
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified. At equipment with factory transformer- GEC installed and connected.

Electrical Final Inspection Not Ready 4/13/2021 4/13/2021 (AM) 04/14/2021
Corrections:


All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
04/14/2021
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified. At equipment with factory transformer- GEC installed and connected.

Miscellaneous/Other
Carried Forward
04/14/2021
Inspector emailed independent 3rd party engineer to verify status of evaluation report. 04/14/2021

Electrical Final Inspection Passed 6/29/2023 (10:00 - 12:00) 6/29/2023 (AM) 06/29/2023
Corrections:


All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Resolved
06/29/2023
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified. At equipment with factory transformer- GEC installed and connected.

Miscellaneous/Other
Resolved
06/29/2023
Inspector emailed independent 3rd party engineer to verify status of evaluation report. 04/14/2021