PREL202013099
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Failed | 11/23/2020 (8:00 - 10:00) | 11/23/2020 (AM) | 11/23/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
11/23/2020
Inspector unable to locate work location and was given no building or site information/ lock box codes or other access information.
Inspector unable to reach contact by phone- no answer and no voicemail.
Contractor to re-schedule with adequate access information. Inspector is assuming that the work was on/at rooftop for cell service...need all access information and keys/codes to access electrical room(s)/ rooftop and cabinets.
|
||||
Electrical Rough-in Inspection | Passed | 12/4/2020 (8:00 - 10:00) | 12/4/2020 (AM) | 12/04/2020 |
PLEASE SCHEDULE ERIC FOR THIS PER T. MILLER. GIVE 1 HR OF TIME. 11/23/2020 - KB | ||||
Corrections:
Miscellaneous/Other
Resolved
12/04/2020
Inspector unable to locate work location and was given no building or site information/ lock box codes or other access information.
Inspector unable to reach contact by phone- no answer and no voicemail.
Contractor to re-schedule with adequate access information. Inspector is assuming that the work was on/at rooftop for cell service...need all access information and keys/codes to access electrical room(s)/ rooftop and cabinets.
|
||||
Miscellaneous/Other
Comment Only
12/04/2020
Panel and transformer change- ok
See notes on final inspection for correction of GEC.
|
||||
Electrical Final Inspection | Failed | 12/4/2020 (8:00 - 10:00) | 12/4/2020 (AM) | 12/04/2020 |
PLEASE SCHEDULE ERIC FOR THIS PER T. MILLER. GIVE 1 HR OF TIME. 11/23/2020 - KB | ||||
Corrections:
Miscellaneous/Other
Carried Forward
12/04/2020
GEC needs to be connected to panel where bonding of grounded conductor is happening.
Send picture of GEC connection to,
Echanson@bloomingtonmn.gov
|
||||
Electrical Final Inspection | Passed | 12/08/2020 | ||
Corrections:
Miscellaneous/Other
Resolved
12/08/2020
GEC needs to be connected to panel where bonding of grounded conductor is happening.
Send picture of GEC connection to,
Echanson@bloomingtonmn.gov
|
||||
Miscellaneous/Other
Comment Only
12/08/2020
Pictures received of GEC connection. - ok
|