PREL202013616
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
03/08/2021
Partial pass- wiring to equipment OK.
Equipment requires independent 3rd party evaluation.
|
||||
Electrical Rough-in Inspection | Partial Pass | 11/4/2020 (10:00 - 12:00) | 11/4/2020 (AM) | 11/04/2020 |
Corrections:
Miscellaneous/Other
Comment Only
11/04/2020
Work in the pre-fab area OK. Verbal to increase sizing of grounding electrode conductor- minimum #6 where not installed in a raceway.
Equipment requires NRTL or independent 3rd party evaluation.
Inspection at clean room area- to be scheduled with other permits for tools.
|
||||
Electrical Final Inspection | Partial Pass | 3/5/2021 (10:00 - 12:00) | 3/5/2021 (AM) | 03/08/2021 |
Corrections:
Miscellaneous/Other
Carried Forward
03/08/2021
Partial pass- wiring to equipment OK.
Equipment requires independent 3rd party evaluation.
|