PREL202100961
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Passed w/ Conditions | 6/9/2021 (12:30 - 2:30) | 6/9/2021 (PM) | 06/09/2021 |
Corrections:
Miscellaneous/Other
Comment Only
06/09/2021
Met contractor on site- verbal corrections:
1. Install locknut at rigid metal conduit at meter enclosure - service conductor raceway.
2. Install arc flash warning label, install available fault current label & label main as service disconnect means.
3. Label the intrinsically safe raceway.
Service released to Xcel.
Email photos to: tmiller@bloomingtonmn.gov
|