Permit Application Status

PREL202104760


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202104760
Electrical
Finaled
GKII NORTHLAND CENTER LLC
Alteration/Repair/Replace
Remodel for TI
04/27/2021
05/03/2021
01/23/2022
07/27/2021

Locations

Permits

Permit Number: PREL202104760

Electrical
Finaled
05/03/2021
01/23/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 5/5/2021 (12:30 - 2:30) 5/5/2021 (PM) 05/06/2021
Corrections:


Miscellaneous/Other
Carried Forward
05/06/2021
Partial wall RI- ok Need to have ceilings and north half area RI

Electrical Rough-in Inspection Partial Pass 6/9/2021 (2:30 - 3:30) 6/9/2021 (PM) 06/09/2021
Corrections:


Miscellaneous/Other
Carried Forward
06/09/2021
Partial wall RI- ok Need to have ceilings and north half area RI

Miscellaneous/Other
Comment Only
06/09/2021
Above ceiling in offices - ok Still need kitchen area.

Miscellaneous/Other
Carried Forward
06/09/2021
Dimming line from LED power supplies to jbox from switch, need to be class 1 wiring

Electrical Rough-in Inspection Passed w/ Conditions 6/30/2021 (12:30 - 2:30) 6/30/2021 (PM) 07/01/2021
Corrections:


Miscellaneous/Other
Resolved
07/01/2021
Partial wall RI- ok Need to have ceilings and north half area RI

Miscellaneous/Other
Outstanding
06/09/2021
Dimming line from LED power supplies to jbox from switch, need to be class 1 wiring

Miscellaneous/Other
Comment Only
07/01/2021
Kitchen area ceiling RI- ok Will check outstanding items at final.

Electrical Final Inspection Partial Pass 7/8/2021 (12:30 - 2:30) 7/8/2021 (PM) 07/08/2021
Corrections:


Miscellaneous/Other
Comment Only
07/08/2021
Final for office spaces - ok Still need kitchen area final.

Electrical Final Inspection Failed 7/22/2021 (12:30 - 2:30) 7/22/2021 (PM) 07/22/2021
Corrections:


Miscellaneous/Other
Carried Forward
07/22/2021
GFCI protection required per 210.8B for kitchen/ prep areas.

Electrical Final Inspection Passed 7/27/2021 (8:00 - 10:00) 7/27/2021 (AM) 07/27/2021
Corrections:


Miscellaneous/Other
Resolved
07/27/2021
GFCI protection required per 210.8B for kitchen/ prep areas.