Permit Application Status

PREL202105219


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202105219
Electrical
Finaled
ELDER-JONES ASSOCIATES
Other
Wire ATS at Generator
05/05/2021
05/20/2021
06/12/2022
12/14/2021

Locations

Permits

Permit Number: PREL202105219

Electrical
Finaled
05/20/2021
06/12/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Failed 6/25/2021 (10:00 - 12:00) 6/25/2021 (AM) 06/25/2021
Corrections:


Miscellaneous/Other
Carried Forward
06/25/2021
1. Liquid tight conduit at roof lacks any fitting. 2. Label all panels to code- available fault current, arc flash warning 3. Label at service per 702.7 ( A ) & 701.2 ( B ). 4. Label ATS per 702.5 ( C ) 5. Bond at raceway between ATS and New optional standby panel- the knockout for the raceway at the ATS is larger than the EMT fitting and locknut. Bond the raceway to ensure a low impedance return path for all EGC.

Electrical Final Inspection Failed 12/1/2021 (10:00 - 12:00) 12/1/2021 (AM) 12/02/2021
Corrections:


Miscellaneous/Other
Comment Only
12/02/2021
1. Liquid tight conduit at roof lacks any fitting. 2. Label all panels to code- available fault current, arc flash warning 3. Label at service per 702.7 ( A ) & 701.2 ( B ). 4. Label ATS per 702.5 ( C ) 5. Bond at raceway between ATS and New optional standby panel- the knockout for the raceway at the ATS is larger than the EMT fitting and locknut. Bond the raceway to ensure a low impedance return path for all EGC.

Miscellaneous/Other
Carried Forward
12/02/2021
Met generator service tech on site. Provide all required labeling as discussed and documented previously. Install bond bushing at raceway from ATS to generator panel- knock out at ATS is oversized for raceway- tighten locknut at conduit. Bond at raceway between ATS and New optional standby panel- the knockout for the raceway at the ATS is larger than the EMT fitting and locknut. Bond the raceway to ensure a low impedance return path for all EGC.

Electrical Final Inspection Passed 12/14/2021 (8:00 - 10:00) 12/14/2021 (AM) 12/14/2021
Corrections:


Miscellaneous/Other
Resolved
12/14/2021
Met generator service tech on site. Provide all required labeling as discussed and documented previously. Install bond bushing at raceway from ATS to generator panel- knock out at ATS is oversized for raceway- tighten locknut at conduit. Bond at raceway between ATS and New optional standby panel- the knockout for the raceway at the ATS is larger than the EMT fitting and locknut. Bond the raceway to ensure a low impedance return path for all EGC.

Miscellaneous/Other
Comment Only
12/14/2021
Verbal to complete labeling at main service location.