PREL202105956
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Failed | 10/22/2021 (12:30 - 2:30) | 10/22/2021 (PM) | 10/22/2021 |
Electrical Final Inspection | Failed | 10/22/2021 (12:30 - 2:30) | 10/22/2021 (PM) | 10/22/2021 |
Corrections:
Miscellaneous/Other
Carried Forward
10/22/2021
No RI inspections completed. Not scheduled for enough time onsite. Contacted contractor to reschedule and meet onsite to open panels and transformers.
|
||||
Electrical Final Inspection | Failed | 10/26/2021 (12:30 - 2:30) | 10/26/2021 (PM) | 10/26/2021 |
Corrections:
Miscellaneous/Other
Carried Forward
10/26/2021
Structural metal steel shall be bonded to main grounding electrode system.
|
||||
Miscellaneous/Other
Carried Forward
10/26/2021
Supply side bonding jumper at transformer needs to be sized properly to conductor size.
|
||||
Miscellaneous/Other
Carried Forward
10/26/2021
Available fault current labeling needed at new panels and to verify 480 feeder breakers.
|
||||
Electrical Final Inspection | Passed | 11/2/2021 (12:30 - 2:30) | 11/2/2021 (PM) | 11/03/2021 |
Corrections:
Miscellaneous/Other
Resolved
11/03/2021
No RI inspections completed. Not scheduled for enough time onsite. Contacted contractor to reschedule and meet onsite to open panels and transformers.
|
||||
Miscellaneous/Other
Comment Only
11/03/2021
Corrections made from inspection prior.
Metal roof bonded, supply side bonding jumper corrected.
|
||||
Lighting Inspection Sign | Passed | 12/04/2021 |