PREL202108837
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Passed w/ Conditions | 9/22/2021 (10:00 - 12:00) | 9/22/2021 (AM) | 09/24/2021 |
Corrections:
Miscellaneous/Other
Outstanding
09/24/2021
Service requires minimum of two ground rods.
Bond isolated section of metal raceway containing service conductors- at utility pole.
Relocate grounding electrode conductor termination at service panel or install wire jumper between neutral bar and equipment grounding terminations.
Provide protection from physical damage of raceway at utility pole.
|
||||
Electrical Final Inspection | Passed | 11/16/2022 (12:30 - 2:30) | 11/16/2022 (PM) | 11/16/2022 |