PREL202109337
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Pending | |||
Electrical Final Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
08/09/2021
Remove bond screw at disconnect means- disconnect is on the load side of the service disconnect. Install lug for equipment grounding conductor and separate from neutral termination.
Install arc flash warning labels.
Verify and document ( label ) the available fault current at the disconnect and the new panelboard. Label all disconnect and meter for reference of location of feeder.
|
||||
Electrical Final Inspection | Partial Pass | 8/9/2021 (10:00 - 12:00) | 8/9/2021 (AM) | 08/09/2021 |
Corrections:
Miscellaneous/Other
Carried Forward
08/09/2021
Remove bond screw at disconnect means- disconnect is on the load side of the service disconnect. Install lug for equipment grounding conductor and separate from neutral termination.
Install arc flash warning labels.
Verify and document ( label ) the available fault current at the disconnect and the new panelboard. Label all disconnect and meter for reference of location of feeder.
|