PREL202110635
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Final Inspection | Pending | |||
|
Corrections:
Miscellaneous/Other
Outstanding
10/26/2021
Improper MC cable termination at furnace.
Install MC cable to code- with connector at each end- termination to be made in factory provided j-box with factory cover.
Note: Inspector sent photo of violation in a separate e-mail.
|
||||
|
Miscellaneous/Other
Outstanding
10/26/2021
Inspection was scheduled for 10/26/2021
Corrections have not been made.
Repair to code and call for re-inspection.
|
||||
| Electrical Final Inspection | Failed | 8/18/2021 (10:00 - 12:00) | 8/18/2021 (AM) | 08/19/2021 |
|
Corrections:
Miscellaneous/Other
Carried Forward
08/19/2021
Improper MC cable termination at furnace.
Install MC cable to code- with connector at each end- termination to be made in factory provided j-box with factory cover.
Note: Inspector sent photo of violation in a separate e-mail.
|
||||
| Electrical Final Inspection | Failed | 10/26/2021 (8:00 - 10:00) | 10/26/2021 (AM) | 10/26/2021 |
|
Corrections:
Miscellaneous/Other
Carried Forward
10/26/2021
Improper MC cable termination at furnace.
Install MC cable to code- with connector at each end- termination to be made in factory provided j-box with factory cover.
Note: Inspector sent photo of violation in a separate e-mail.
|
||||
|
Miscellaneous/Other
Carried Forward
10/26/2021
Inspection was scheduled for 10/26/2021
Corrections have not been made.
Repair to code and call for re-inspection.
|
||||