PREL202111358
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Passed | 09/15/2021 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/15/2021
Replacement of customer owned transformer-
Visual only-
Neutral bond OK- to existing grounding electrode system.
Reconnection of existing transformer secondary conductors-
equipment was energized at inspection- visual only.
Inspector was not able to view OCP sizing at secondary switch- existing OCP remained.
|