Permit Application Status

PREL202113149


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202113149
Electrical
Finaled
DRFC METRO LLC
Alteration/Repair/Replace
Lighting wiring for 1 single pole light switches, wall mount occupancy sensors, dimmer switches. Install recess can lights, exit lights. Low voltage data rings with pull strings- provide temp lighting and power
10/04/2021
10/12/2021
11/30/2022
06/03/2022

Locations

Permits

Permit Number: PREL202113149

Electrical
Finaled
10/12/2021
11/30/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 10/26/2021 (8:00 - 10:00) 10/26/2021 (AM) 10/26/2021
Corrections:


Miscellaneous/Other
Comment Only
10/26/2021
Inspector note- this is a phased project with work on bot second and third floors. RI of walls at Phase 1- 3rd floor walls OK

Electrical Rough-in Inspection Partial Pass 11/4/2021 (10:00 - 12:00) 11/4/2021 (AM) 11/04/2021
Corrections:


Miscellaneous/Other
Comment Only
11/04/2021
Phase 2 - second floor ( suite 200 ) wall RI OK.

Electrical Rough-in Inspection Partial Pass 11/24/2021 (12:30 - 2:30) 11/24/2021 (PM) 11/24/2021
Corrections:


Miscellaneous/Other
Comment Only
11/24/2021
2nd floor Phase 2 lighting/above ceiling for power & light OK 3rd Floor Phase 1 lighting/above ceiling for power & light OK

Electrical Rough-in Inspection Not Ready 1/26/2022 (12:30 - 2:30) 1/26/2022 (PM) 01/26/2022
Corrections:


Miscellaneous/Other
Comment Only
01/26/2022
Phased project- no rough-in inspections on 01/26/2022. Phase 3 has not yet started.

Electrical Final Inspection Partial Pass 1/26/2022 (12:30 - 2:30) 1/26/2022 (PM) 01/26/2022
Corrections:


Miscellaneous/Other
Comment Only
01/26/2022
Phased project- Partial pass- Phase one final OK- Suite 300 Contractor to verify with building inspector for egress lighting requirements in break room area.

Electrical Rough-in Inspection Passed 5/12/2022 (10:00 - 12:00) 5/12/2022 (AM) 05/12/2022
Corrections:


Miscellaneous/Other
Comment Only
05/12/2022
Wall and ceiling RI- ok

Electrical Final Inspection Passed 6/3/2022 (10:00 - 12:00) 6/3/2022 (AM) 06/03/2022
Corrections:


Miscellaneous/Other
Comment Only
06/03/2022
GFCI- ok Final- ok