PREL202113244
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Final Inspection | Pending | |||
|
Corrections:
Miscellaneous/Other
Outstanding
12/03/2021
OK to release to Xcel.
Label available fault current at service
|
||||
| Electrical Final Inspection | Failed | 11/29/2021 (8:00 - 10:00) | 11/29/2021 (AM) | 11/29/2021 |
|
Corrections:
Miscellaneous/Other
Carried Forward
11/29/2021
1. Install main bond screw at 200 AMP service at panel east of meter enclosure.
2. Install second ground rod.
3. Service has a 10,000 AMP A.I.C. rating- provide label for available fault current- Xcel transformer is in place and size and length of service conductors is known.
Call for re-inspection.
|
||||
| Electrical Final Inspection | Partial Pass | 12/2/2021 (10:00 - 12:00) | 12/2/2021 (AM) | 12/03/2021 |
|
Corrections:
Miscellaneous/Other
Resolved
12/03/2021
1. Install main bond screw at 200 AMP service at panel east of meter enclosure.
2. Install second ground rod.
3. Service has a 10,000 AMP A.I.C. rating- provide label for available fault current- Xcel transformer is in place and size and length of service conductors is known.
Call for re-inspection.
|
||||
|
Miscellaneous/Other
Carried Forward
12/03/2021
OK to release to Xcel.
Label available fault current at service
|
||||