Permit Application Status

PREL202114122


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202114122
Electrical
Finaled
OXBOW REALTY PARTNERS LLC
Other
1. Install 60’ of 2”EMT from panel HP 8330 2. Install non fused disconnect on line side of transformer 3. Install 75kva transformer 4. Install fused disconnect on load side 5. Install 35’ wire to bond transformer 6. Install 30’-2” EMT from disconnect to tool in fab - (2141.4851)
10/20/2021
10/25/2021
08/24/2022
02/25/2022

Locations

Permits

Permit Number: PREL202114122

Electrical
Finaled
10/25/2021
08/24/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Passed 10/26/2021 (10:00 - 12:00) 10/26/2021 (AM) 10/26/2021
Electrical Final Inspection Not Ready 10/26/2021 (10:00 - 12:00) 10/26/2021 (AM) 10/26/2021
Corrections:


Miscellaneous/Other
Carried Forward
10/26/2021
Unlisted tool- lacks NRTL. Requires independent 3rd party evaluation. Installation work OK.

Electrical Final Inspection Partial Pass 11/9/2021 (10:00 - 12:00) 11/9/2021 (AM) 11/09/2021
Corrections:


Miscellaneous/Other
Carried Forward
11/09/2021
Unlisted tool- lacks NRTL. Requires independent 3rd party evaluation. Installation work OK.

Miscellaneous/Other
Carried Forward
11/09/2021
Additional inspection- Provide secondary conductor overcurrent protection for transformer secondary conductors. Provide connection to establish a ground electrical system with a intentionally grounded circuit conductor. Call for subsequent field inspection.

Electrical Final Inspection Not Ready 11/15/2021 (10:00 - 12:00) 11/15/2021 (AM) 11/15/2021
Corrections:


Miscellaneous/Other
Carried Forward
11/15/2021
Unlisted tool- lacks NRTL. Requires independent 3rd party evaluation. Installation work OK.

Miscellaneous/Other
Carried Forward
11/15/2021
Additional inspection- Provide secondary conductor overcurrent protection for transformer secondary conductors. Provide connection to establish a ground electrical system with a intentionally grounded circuit conductor. Call for subsequent field inspection.

Miscellaneous/Other
Comment Only
11/15/2021
Contact had scheduling conflict- Please reschedule

Electrical Final Inspection Partial Pass 11/23/2021 (10:00 - 12:00) 11/23/2021 (AM) 11/23/2021
Corrections:


Miscellaneous/Other
Resolved
02/25/2022
Unlisted tool- lacks NRTL. Requires independent 3rd party evaluation. Installation work OK.

Miscellaneous/Other
Resolved
02/25/2022
Additional inspection- Provide secondary conductor overcurrent protection for transformer secondary conductors. Provide connection to establish a ground electrical system with a intentionally grounded circuit conductor. Call for subsequent field inspection.

Miscellaneous/Other
Resolved
02/25/2022
Final OK pending 3rd party evaluation.

Electrical Final Inspection Passed 02/25/2022
Corrections:


Miscellaneous/Other
Outstanding
11/23/2021
Final OK pending 3rd party evaluation.