PREL202116050
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 1/6/2022 (12:30 - 2:30) | 1/6/2022 (PM) | 01/06/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
01/06/2022
Laser / spa procedure rooms =5
Hair washing rooms =6
Break room wall rough in
Temp controls?
Fire permit needed
|
||||
Electrical Rough-in Inspection | Passed | 2/23/2022 (8:00 - 10:00) | 2/23/2022 (AM) | 02/23/2022 |
Corrections:
Miscellaneous/Other
Comment Only
02/23/2022
Laser / spa procedure rooms =5
Hair washing rooms =6
Break room wall rough in
Temp controls?
Fire permit needed
|
||||
Miscellaneous/Other
Comment Only
02/23/2022
Above ceiling RI OK
Includes FA cabling
No temperature control work- pneumatic
|
||||
Electrical Final Inspection | Partial Pass | 4/28/2022 (10:00 - 12:00) | 4/28/2022 (AM) | 04/28/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
04/28/2022
Final- partial pass.
There is work to complete at the reception area.
Inspector spoke to contractor foreman:
provide GFCI protection of receptacles at laundry.
Call final when completed.
|
||||
Electrical Final Inspection | Passed | 5/27/2022 (12:30 - 2:30) | 5/27/2022 (PM) | 05/27/2022 |
Corrections:
Miscellaneous/Other
Resolved
05/27/2022
Final- partial pass.
There is work to complete at the reception area.
Inspector spoke to contractor foreman:
provide GFCI protection of receptacles at laundry.
Call final when completed.
|