PREL202201062
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Failed | 4/8/2022 (10:00 - 12:00) | 4/8/2022 (AM) | 04/08/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
04/08/2022
Circuit labeling required on both panel and controllers.
CB requires red labeling and lock on device.
Send pictures of corrections to: echanson@bloomingtonmn.gov
|
||||
Electrical Final Inspection | Passed w/ Conditions | 04/21/2022 | ||
Corrections:
Miscellaneous/Other
Resolved
04/21/2022
Circuit labeling required on both panel and controllers.
CB requires red labeling and lock on device.
Send pictures of corrections to: echanson@bloomingtonmn.gov
|
||||
Miscellaneous/Other
Outstanding
04/21/2022
Permanent labeling should be installed per NEC.
|