Summary

PREL202201085
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
SEA LIFE QUARANTINE AREA ELECTRICAL BUILDOUT AT MOA
02/02/2022
02/04/2022
06/18/2023
12/20/2022

Locations

Permits

Permit Number: PREL202201085

Electrical
Finaled
02/04/2022
06/18/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 3/8/2022 (8:00 - 10:00) 3/8/2022 (AM) 03/08/2022
Corrections:


Miscellaneous/Other
Comment Only
03/08/2022
Wall RI OK Call for any bonding or other inspections as needed or required.

Electrical Rough-in Inspection Passed 05/13/2022
Corrections:


Miscellaneous/Other
Comment Only
05/13/2022
Above ceiling- ok

Electrical Rough-in Inspection Partial Pass 10/31/2022 (12:30 - 2:30) 10/31/2022 (PM) 10/31/2022
Corrections:


Miscellaneous/Other
Comment Only
10/31/2022
Wall RI- ok

Electrical Final Inspection Passed 12/20/2022 (8:00 - 10:00) 12/20/2022 (AM) 12/20/2022
Corrections:


Miscellaneous/Other
Comment Only
12/20/2022
Training room area - ok