PREL202201357
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Pending | |||
Electrical Rough-in Inspection | Partial Pass | 3/4/2022 (10:00 - 12:00) | 3/4/2022 (AM) | 03/04/2022 |
Corrections:
Miscellaneous/Other
Comment Only
03/04/2022
FA work for 8th floor - ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/11/2022 (10:00 - 12:00) | 3/11/2022 (AM) | 03/11/2022 |
Corrections:
Miscellaneous/Other
Comment Only
03/11/2022
Fire alarm cable installation OK- 9th floor.
Verify requirements with building inspector in regards to location of FA power supply equipment.
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/21/2022 (10:00 - 12:00) | 3/21/2022 (AM) | 03/21/2022 |
Corrections:
Miscellaneous/Other
Comment Only
03/21/2022
FA cable installation Ok 10th floor
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/8/2022 (12:30 - 2:30) | 4/8/2022 (PM) | 04/08/2022 |
Corrections:
Miscellaneous/Other
Comment Only
04/08/2022
RI OK for FA cable 11th floor
|
||||
Electrical Rough-in Inspection | Partial Pass | 5/11/2022 (10:00 - 12:00) | 5/11/2022 (AM) | 05/11/2022 |
Electrical Rough-in Inspection | Partial Pass | 8/22/2022 (8:00 - 10:00) | 8/22/2022 (AM) | 08/22/2022 |
Corrections:
Miscellaneous/Other
Comment Only
08/22/2022
14th floor partial RI- ok
|
||||
Electrical Rough-in Inspection | Passed | 9/7/2022 (8:00 - 10:00) | 9/7/2022 (AM) | 09/07/2022 |
Corrections:
Miscellaneous/Other
Comment Only
09/07/2022
FA RI for remaining rooms on 14th floor - ok
|