PREL202201932
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Pending | |||
Electrical Final Inspection | Not Ready | 4/13/2022 (8:00 - 10:00) | 4/13/2022 (AM) | 04/13/2022 |
Corrections:
Miscellaneous/Other
Resolved
04/14/2022
Not ready for final-
Verify AIC rating at single phase service
|
||||
Miscellaneous/Other
Resolved
04/14/2022
Inspector Note:
There are two separate permits for temp power-
This permit is for the service on the south end of the site-
Verify AIC rating of the main-
Available fault current exceeds 10 K
If series rated- label to code
|
||||
Electrical Final Inspection | Not Ready | 04/13/2022 | ||
Corrections:
Miscellaneous/Other
Carried Forward
04/13/2022
Not ready for final- see RI notes.
No loads connected at the 3 phase service.
Verify AIC rating at single phase service
Email sent to project manager at Medina Electric
wiring to and at service is OK
verify available vs. AIC rating
Service is not yet released to Xcel
|
||||
Electrical Final Inspection | Partial Pass | 04/14/2022 | ||
Corrections:
Miscellaneous/Other
Resolved
04/14/2022
Not ready for final- see RI notes.
No loads connected at the 3 phase service.
Verify AIC rating at single phase service
Email sent to project manager at Medina Electric
wiring to and at service is OK
verify available vs. AIC rating
Service is not yet released to Xcel
|
||||
Miscellaneous/Other
Resolved
04/14/2022
Service Ok to release to Xcel
|
||||
Miscellaneous/Other
Comment Only
04/14/2022
Temp service released to Xcel
|