PREL202202572
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Failed | 10/27/2022 (2:30 - 3:30) | 10/27/2022 (PM) | 10/28/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
10/28/2022
Available fault currents needed. Labeling required on service and all OCP enclosures.
|
||||
Miscellaneous/Other
Carried Forward
10/28/2022
Feeder wiring on roof required to be properly supported and not laying on roof.
|
||||
Miscellaneous/Other
Carried Forward
10/28/2022
Seal tight used to protect PV wiring required to be properly bonded around to array racking.
Seal tights required to be properly supported.
|
||||
Miscellaneous/Other
Carried Forward
10/28/2022
PV wiring required to be properly supported at a minimum per NEC 690.31C1
|
||||
Electrical Final Inspection | Passed | 11/16/2022 (10:00 - 12:00) | 11/16/2022 (AM) | 11/16/2022 |
Corrections:
Miscellaneous/Other
Resolved
11/16/2022
Available fault currents needed. Labeling required on service and all OCP enclosures.
|
||||
Miscellaneous/Other
Resolved
11/16/2022
Feeder wiring on roof required to be properly supported and not laying on roof.
|
||||
Miscellaneous/Other
Resolved
11/16/2022
Seal tight used to protect PV wiring required to be properly bonded around to array racking.
Seal tights required to be properly supported.
|
||||
Miscellaneous/Other
Resolved
11/16/2022
PV wiring required to be properly supported at a minimum per NEC 690.31C1
|