Permit Application Status

PREL202203463


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202203463
Electrical
Expired
NORTHLAKE VENTURES-BLOOMINGTON LLC
Alteration/Repair/Replace
100A 3 PHASE SER TRANSFER SWITCH FOR 38KW GENERAC GENERATOR.
04/05/2022
04/08/2022
11/22/2022

Locations

Permits

Permit Number: PREL202203463

Electrical
Expired
04/08/2022
11/22/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
05/26/2022
Available fault currents required to be labeled on transfer switch, new panel, existing panel with new feeder breaker installed.

Miscellaneous/Other
Outstanding
05/26/2022
100a feeders require minimum #3, currently #4 being used for normal feeder sizing.

Miscellaneous/Other
Outstanding
05/26/2022
Compression fittings on roof not tightened.

Miscellaneous/Other
Outstanding
05/26/2022
New panel feeding IT receptacles, Neutral conductors of similar circuits required to be identified with the proper ungrounded circuit. as described in NEC 200.4

Miscellaneous/Other
Outstanding
05/26/2022
Proper labeling and placards required to comply with NEC 702.7A and B required. Placards shall be placed at the transfer equipment and the service entrance equipment.

Miscellaneous/Other
Outstanding
05/26/2022
Documentation needed for rating of transfer equipment 100a feeders being utilized, 150a genset CB feeding the transfer equipment.

Miscellaneous/Other
Outstanding
05/26/2022
Documentation needed for switch on exterior of genset skid, is this being used as the required EPO. .

Electrical Final Inspection Failed 5/24/2022 (8:00 - 10:00) 5/24/2022 (AM) 05/26/2022
Corrections:


Miscellaneous/Other
Carried Forward
05/26/2022
Available fault currents required to be labeled on transfer switch, new panel, existing panel with new feeder breaker installed.

Miscellaneous/Other
Carried Forward
05/26/2022
100a feeders require minimum #3, currently #4 being used for normal feeder sizing.

Miscellaneous/Other
Carried Forward
05/26/2022
Compression fittings on roof not tightened.

Miscellaneous/Other
Carried Forward
05/26/2022
New panel feeding IT receptacles, Neutral conductors of similar circuits required to be identified with the proper ungrounded circuit. as described in NEC 200.4

Miscellaneous/Other
Carried Forward
05/26/2022
Proper labeling and placards required to comply with NEC 702.7A and B required. Placards shall be placed at the transfer equipment and the service entrance equipment.

Miscellaneous/Other
Carried Forward
05/26/2022
Documentation needed for rating of transfer equipment 100a feeders being utilized, 150a genset CB feeding the transfer equipment.

Miscellaneous/Other
Carried Forward
05/26/2022
Documentation needed for switch on exterior of genset skid, is this being used as the required EPO. .