Permit Application Status

PREL202204630


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202204630
Electrical
Finaled
BLMGTN SCHOOL DIST #271
Alteration/Repair/Replace
New Lighting, Chiller wiring, Fire Alarm, Existing School
04/29/2022
05/09/2022
02/07/2024
08/11/2023

Locations

Permits

Permit Number: PREL202204630

Electrical
Finaled
05/09/2022
02/07/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 6/15/2022 (10:00 - 12:00) 6/15/2022 (AM) 06/15/2022
Site visit
Corrections:


Miscellaneous/Other
Comment Only
06/15/2022
Walk site for questions on site for upcoming RI inspections.

Electrical Rough-in Inspection Partial Pass 7/5/2022 (8:00 - 10:00) 7/5/2022 (AM) 07/05/2022
RI walls all of Area B
Corrections:


Miscellaneous/Other
Comment Only
07/05/2022
R.I walls All of Area B

Electrical Rough-in Inspection Partial Pass 7/15/2022 (8:00 - 10:00) 7/15/2022 (AM) 07/15/2022
All of Area B. - R. I. Walls
Corrections:


Miscellaneous/Other
Comment Only
07/15/2022
All of area “B” - R.I. Walls.

Electrical Rough-in Inspection Partial Pass 8/2/2022 (12:30 - 2:30) 8/2/2022 (PM) 08/02/2022
Area B RI ceilings.
Corrections:


Miscellaneous/Other
Comment Only
08/02/2022
Areas B - signed of on the room sheets for ceilings.

Electrical Rough-in Inspection Failed 8/9/2022 (12:30 - 2:30) 8/9/2022 (PM) 08/09/2022
Low voltage cables from communication, thermostat and speakers need to be removed if abandoned and not part of the new systems. Area B rooms and hallways.
Corrections:


Miscellaneous/Other
Carried Forward
08/09/2022
RI ceilings Area B rooms and hallways need to have all the abandoned communication, thermostat, speaker cables removed if not part of the new systems. Temporary lights also need removing and KO seals in all junction boxes with covers on.

Electrical Rough-in Inspection Partial Pass 8/12/2022 (10:00 - 12:00) 8/12/2022 (AM) 08/12/2022
Area”A” R. I. Ceilings Ok to pad out.
Corrections:


Miscellaneous/Other
Comment Only
08/12/2022
Area A R. I. Ceilings Ok now to pad out with tiles.

Electrical Rough-in Inspection Partial Pass 8/15/2022 (12:30 - 2:30) 8/15/2022 (PM) 08/15/2022
Area B hallways and rooms, see print in KA trailer for my sign off areas.
Corrections:


Miscellaneous/Other
Outstanding
08/09/2022
RI ceilings Area B rooms and hallways need to have all the abandoned communication, thermostat, speaker cables removed if not part of the new systems. Temporary lights also need removing and KO seals in all junction boxes with covers on.

Miscellaneous/Other
Comment Only
08/15/2022
R.I. Ceilings Area B corridors and rooms - Ok See print in KA trailer for my sign off areas.

Electrical Rough-in Inspection Partial Pass 8/16/2022 (12:30 - 2:30) 8/16/2022 (PM) 08/16/2022
R.I ceilings hallways and rest of rooms on print for pad out.
Electrical Rough-in Inspection Partial Pass 8/17/2022 (12:30 - 2:30) 8/17/2022 (PM) 08/17/2022
Checking rooms for power and open wiring. List with contractor what’s done and not done.
Electrical Rough-in Inspection Passed 8/18/2022 (12:30 - 2:30) 8/18/2022 (PM) 08/18/2022
All R.I. Done- have Temporary Occupancy, need final when all completed.
Electrical Rough-in Inspection Passed 8/24/2022 (10:00 - 12:00) 8/24/2022 (AM) 08/24/2022
All R.I done- gave temporary occupancy until final inspection.
Electrical Final Inspection Passed 8/11/2023 (12:30 - 2:30) 8/11/2023 (PM) 08/11/2023